-
#160
by
Nick L.
on 25 May, 2013 00:51
-
Altitude 117.6 nm, speed 29460 ft/sec.
Less than 5 minutes until second burn.
-
#161
by
pippin
on 25 May, 2013 00:51
-
SRMs were visible due to residual burning. Saw them for quite sometime after
One could be seen falling across the video image quite a while after separation.
-
#162
by
Nick L.
on 25 May, 2013 00:52
-
-
#163
by
PahTo
on 25 May, 2013 00:53
-
Was that DOAMS capturing those great images? SRM sep, PLF sep, RL-10 start--just incredible...
-
#164
by
robertross
on 25 May, 2013 00:53
-
2-1/2 min until burn
-
#165
by
robertross
on 25 May, 2013 00:53
-
-
#166
by
robertross
on 25 May, 2013 00:54
-
ACS jets 9&11 on now
-
#167
by
Nick L.
on 25 May, 2013 00:54
-
Switched to settling thrusters 9 and 11. (was 10 and 12 before).
-
#168
by
Nick L.
on 25 May, 2013 00:55
-
Less than 1 minute until restart.
-
#169
by
robertross
on 25 May, 2013 00:55
-
2nd burn started
-
#170
by
Nick L.
on 25 May, 2013 00:55
-
Second stage restart.
Good chamber pressure and engine control.
-
#171
by
Chris Bergin
on 25 May, 2013 00:56
-
Second burn underway - three minute burn.
-
#172
by
robertross
on 25 May, 2013 00:56
-
good chamber pressure. Good and stable
-
#173
by
Nick L.
on 25 May, 2013 00:56
-
Chamber pressure holding. Looks like the animation froze though.
-
#174
by
Nick L.
on 25 May, 2013 00:57
-
C-band beacon commanded off.
1.5 minutes to go until SECO-2.
-
#175
by
Nick L.
on 25 May, 2013 00:57
-
-
#176
by
Prober
on 25 May, 2013 00:57
-
you got to love those RL-10's
-
#177
by
robertross
on 25 May, 2013 00:58
-
now passing over southern Africa
-
#178
by
Nick L.
on 25 May, 2013 00:58
-
-
#179
by
robertross
on 25 May, 2013 00:59
-
telemetry sporatic at the moment (video)