), which is included in the 19,000 lb figure, so there is in fact no extra margin?I'm trying to resolve three data points:
D1) The MUOS-2 satellite is mentioned as being around 15,000 lbs.
D2) The Atlas 551 is listed as supporting about 19,000 lbs to GTO.
D3) The MUOS launch was listed as "performance-limited" by Jake Szatkowski's iCubeSat 2012 presentation, in the context of rideshare availability for payloads between single-digit kilograms up to metric tons.
So, on the face of it, there might seem to be a couple metric tons free in there. Is it
1) ULA was giving MUOS "room to grow," that is, there actually is some capacity available, but they wanted to reserve that capacity in case the customer wanted to make some requirements changes that might reduce it?
2) ULA wants to reserve some margin for mission assurance, perhaps like the RL-10 underperformance a few launches back?
3) MUOSes go to a more energetic orbit than GTO and the 19,000 lbs figure is too high for these satellites?
4) The 15,000 lbs weight figure does not include an adapter or maneuvering fuel or some other hardware (packing peanuts), which is included in the 19,000 lb figure, so there is in fact no extra margin?
5) Fact D1 or D2 is incorrect?
6) the write-in choice, something different from any of the above?
And, perhaps wandering a bit from MUOS-2, if the Orion flight checks out dual-engine Centaurs, is it likely to be used by slightly overweight former 551 satellite customers (I guess NRO, rarely DoD, and very rarely NASA flagship and/or big interplanetary missions)? Is it considerably cheaper than a Delta Heavy?
Last time MUOS-1 was launched towards a 3460 * 35786 km * 19 deg. GTO, which obviously requires more performance than the "standard GTO" (200 * 35786 km * 28.5 deg.) listed for the 19,000 lbs performance.
Option 3, obviously.Last time MUOS-1 was launched towards a 3460 * 35786 km * 19 deg. GTO, which obviously requires more performance than the "standard GTO" (200 * 35786 km * 28.5 deg.) listed for the 19,000 lbs performance.
BTW, Orion and SLS are human rating the DIVUS. Which is still single engine. The Commercial Crew program is doing the DEC. But it adds about 2tonnes only to LEO. It's got worse performance to high energy orbits (MEO/GTO).
I ignore the effect to SSO. But I'm assuming the since ULA is tryi g to use the stock of RL10, they'll rather save an engine and use an extra solid. After all, they have already validated most payloads to SEC. Why change a working solution and have to press ahead the NGE at the same time?
6) the write-in choice, something different from any of the above?Option 3, obviously.Last time MUOS-1 was launched towards a 3460 * 35786 km * 19 deg. GTO, which obviously requires more performance than the "standard GTO" (200 * 35786 km * 28.5 deg.) listed for the 19,000 lbs performance.
It appears that the MUOS-2 spacecraft was moved to Space Launch Complex 41 overnight. @Philtill777 on Twitter posted a pic that appears to be the same KAMAG transporter that has moved Atlas Payloads in the past (MSL pic below) rolling down the road at KSC.
If that is the VAB is the background, that means the KAMAG is heading west towards Astrotech. If so, then I would say that the spacecraft is still at Astrotech