Hello folks,
and here we go, the same parts I needed again for the second front ROFI. For the second base plate I first had to make a new punching tool,

and then bending the supply line and cutting rings for the union nuts. Before fitting the rings I have this slightly widened.


And then I have the supply lines modified and adapted a bit.

After that I have bent on the TSM-template the inner line from 0,4 mm copper wire, where I proceeded step by step. The difficulty here is that the supply line is relatively small and must be made two bends in tight spaces.



Thus, the following bow of the line up was pretty tricky, because it could be only a skimpy millimeter.


The line runs between the service hatch-box and the ladder, as seen here,
Source: NASAand this fits quite well so far.


The next bow runs now right to the ROFI holder and is also relatively short.

And now the last cut only follows, then this supply line is finished,

and can be tried together with the ROFI.

As you can see, the front end is still too long and needs to be filed down slightly. But as the two parts fit together already quite well.

Now the same procedure is carried out only laterally reversed for the supply line at the
LH2-ROFI as long as the work routines are fresh.