Hello all together,
yep Richo, the show can go on.

And so back to the final sprint on the
LH2-TSM.
So, my attempt with the support rod has been proven in any case and was necessary because I can really hardly touch the TSM, because any parts sit anywhere.

And the details still missing, are always delicate, and for that I need both hands free.
Next, the electricians have installed the line and the junction boxes to the back, and the remaining shipping brackets were also mounted.

Next, the small railing supports (1,5x0,25 mm) were mounted at the service platforms, therefore in around it is still prickly now.


Then it was time to finally install the ultimate end antlers on top of the thicker FireEx line, which has again requires the utmost concentration and trembling free hand.


But it worked right away, and I was glad.

And since the electricians were just there, they still have installed the electrical outlets at the bottom of the TSM side, well done cool guys!



So now all the details are mounted up around it.


Now all we need are the ladders. Although I had already shown some ladders in a test fit, however, there was now in the meantime from our German forum nor the well-intentioned suggestion, that I have provided for little too robust ladders which might be replaced by filigree ladders.
Well, since it was already going through my mind, I again looked around for other ladders and found PE ladders from the Polish manufacturer
ABER (1:200) which may could fit and would probably look better than my Plastruct ladders. But now I have to wait yet.

And here are a few impressions, such as the almost finished LH2 TSM looks on the MLP, which was not seen for a long time indeed.


And with this result, I can be quite happy now, I guess.



So long dear friends!