From today's ISS status report at:http://www.nasa.gov/directorates/heo/reports/iss_reports/The following will be done to get the MBSU installed:
[In order to inspect & clean the threads of the bolt/posts on the S0 Truss, Joe scavenged a bolt from a spare PVCU MDM (Photovoltaic Controller Unit Multiplexer/Demultiplexer) bracket that is identical to the H2 bolt on the MBSU. The scavenged bolt will help to tell if the threads on the truss are damaged, and it will “chase” the threads to help remove any FOD (Foreign Object Debris). To turn the bolt and to perform cleaning, Joe, Sunita & Aki built a number of new hand-tools, such as a bolt interface tool, as well as cleaning & lubricating tools using a toothbrush and a wire brush for hand- or PGT use. For in-hole cleaning, Aki build a “chimney-sweep” tool.]
Then, at ~2:30pm, FE-5 & FE-6 talked with EVA-19 specialists on the ground in a 30-min teleconference via S- and Ku-band. [Uplink to Suni & Aki: “We don't have a smoking gun for why the box didn't install… We are going outside to try our best guesses and hope we get lucky… If not, we have developed a flow to get the MBSU inside and potentially take the bolt out for install during EVA 20…”]
Massive set of resources have gone on in L2 if you're a member. If you aren't, become one!!