-
#40
by
anik
on 02 Nov, 2012 12:10
-
Briz-M fifth burn - 08:37:20-08:37:35
Briz-M sixth burn - 08:44:30-08:46:10
Yamal-300K planned initial orbit: 35792.9x35793.1 km, 0.0045 deg
Luch-5B planned initial orbit: 35793.0x35821.7 km, 0.023 deg
-
#41
by
Satori
on 02 Nov, 2012 12:49
-
Moved for live coverage...
-
#42
by
xm11
on 02 Nov, 2012 16:06
-
web cam launch proton work now
-
#43
by
Stan Black
on 02 Nov, 2012 16:12
-
Briz-M fifth burn - 08:37:20-08:37:35
Briz-M sixth burn - 08:44:30-08:46:10
Yamal-300K planned initial orbit: 35792.9x35793.1 km, 0.0045 deg
Luch-5B planned initial orbit: 35793.0x35821.7 km, 0.023 deg
Those last two are just using the low thrust engines and are for disposal?
-
#44
by
Satori
on 02 Nov, 2012 16:28
-
web cam launch proton work now
So soon! Live from Baikonur...
-
#45
by
Satori
on 02 Nov, 2012 16:50
-
At this time the launch pad is cleared of all non-essential personal. It will be reopen at T-2h 30m.
-
#46
by
Satori
on 02 Nov, 2012 17:35
-
T-2h 30m at this time the launch pad re-opens for final closeouts.
-
#47
by
Satori
on 02 Nov, 2012 18:06
-
T-2h All personnel should be in their final positions for launch.
-
#48
by
Satori
on 02 Nov, 2012 18:20
-
Next major event on the countdown and launch preparations will be the rollback of the Mobile Service Tower that starts at T-1h.
-
#49
by
patchfree
on 02 Nov, 2012 19:05
-
For me the live video links from Tsenki and/or Roscosmos badly works...
No other link?
-
#50
by
Art LeBrun
on 02 Nov, 2012 19:07
-
For me the live video links from Tsenki and/or Roscosmos badly works...
No other link?
Spaceflight Now...........
-
#51
by
Gorizont
on 02 Nov, 2012 19:10
-
-
#52
by
patchfree
on 02 Nov, 2012 19:11
-
For me the live video links from Tsenki and/or Roscosmos badly works...
No other link?
Spaceflight Now...........
Thanks.
-
#53
by
Satori
on 02 Nov, 2012 19:21
-
Rollback of the Mobile Service Tower was done without problems.
-
#54
by
Satori
on 02 Nov, 2012 19:22
-
At T-45m LV final countdown activities commence. Propulsion system GO signal is generated by the LV GN&C GLSTE. Countdown display system remote units are synchronized to the master CD clock.
-
#55
by
Satori
on 02 Nov, 2012 19:25
-
-
#56
by
Satori
on 02 Nov, 2012 19:29
-
T-35m LV GN&C GLSTE arms the launch abort systems. Readiness green indicator light illuminates on the launch abort unit front panel. Two redundant displays on the launch abort unit are synchronized to the CD clock and start countdown. SC launch unit abort switch is active.
-
#57
by
Satori
on 02 Nov, 2012 19:33
-
-
#58
by
Gorizont
on 02 Nov, 2012 19:42
-
Good luck Proton and Briz-M for this flight!
-
#59
by
edkyle99
on 02 Nov, 2012 19:51
-