-
#60
by
Satori
on 11 Dec, 2011 10:20
-
-
#61
by
Satori
on 11 Dec, 2011 10:21
-
The show is over for these guys...
-
#62
by
Satori
on 11 Dec, 2011 10:24
-
Stage 2-3 sep!
And we also have fairing sep!
-
#63
by
Bugfix
on 11 Dec, 2011 10:25
-
Firefighters at the launch pad - is this normal?
-
#64
by
Satori
on 11 Dec, 2011 10:26
-
People at the launch pad already...
-
#65
by
Satori
on 11 Dec, 2011 10:26
-
Firefighters at the launch pad - is this normal?
Yes, it is.
-
#66
by
Satori
on 11 Dec, 2011 10:27
-
We have third stage shutdown and separation of the Briz-M with the two satellites. Waiting for Briz-M first ignition.
-
#67
by
Satori
on 11 Dec, 2011 10:28
-
And we have Briz-M ignition!
-
#68
by
Satori
on 11 Dec, 2011 10:30
-
Briz-M first ignition will last 4m 23s.
-
#69
by
patchfree
on 11 Dec, 2011 10:33
-
Nice report Satori!
-
#70
by
Satori
on 11 Dec, 2011 10:33
-
End of Briz-M first ignition.
-
#71
by
tehwkd
on 11 Dec, 2011 10:33
-
Launch of Proton Briz-M carrying Luch-5A & Amos-5.
-
#72
by
patchfree
on 11 Dec, 2011 10:34
-
But I have not observed the 2nd stage trace falling down on the diagram from Khrunitchev. Is-it normal?
-
#73
by
Satori
on 11 Dec, 2011 10:35
-
Second Briz-M ignition will take place at T+1h 7m 35s... So we still have a loooong way to go until the end of the mission.
-
#74
by
Satori
on 11 Dec, 2011 10:37
-
But I have not observed the 2nd stage trace falling down on the diagram from Khrunitchev. Is-it normal?
Yes. I've compared with previous diagrams and we don't see the 2nd stage trace falling down.
-
#75
by
patchfree
on 11 Dec, 2011 10:40
-
But I have not observed the 2nd stage trace falling down on the diagram from Khrunitchev. Is-it normal?
Yes. I've compared with previous diagrams and we don't see the 2nd stage trace falling down.
Probably a problem of telemetry between the 2nd stage and the ground... as all is OK at this time.
-
#76
by
Satori
on 11 Dec, 2011 10:44
-
-
#77
by
Satori
on 11 Dec, 2011 10:48
-
Just to remind. Luch-5A separation will take place at the end of the Briz-M 4th ignition. Separation occurs at T+8h 54m 10s. After this, the Briz-M will execute another ignition (the 5th) and the end separation of Amos-5 occurs ate T+9h 35m 5s.
-
#78
by
input~2
on 11 Dec, 2011 11:08
-
-
#79
by
Satori
on 11 Dec, 2011 11:47
-
Briz-M second ignition occurred as planned.