-
#20
by
Ronsmytheiii
on 03 Aug, 2011 14:22
-
prebreathe complete
-
#21
by
Cbased
on 03 Aug, 2011 14:23
-
Pressure 101mm
-
#22
by
Ronsmytheiii
on 03 Aug, 2011 14:23
-
ISS feed now on ISS truss thanks PAO!
-
#23
by
Cbased
on 03 Aug, 2011 14:25
-
Dropping external pressure and gradually increasing pressure in the Orlans.
Cosmonaughts are asked to report pressure every 30mm
-
#24
by
Ronsmytheiii
on 03 Aug, 2011 14:33
-
O2 open to EVA, going to 12 mm
-
#25
by
Cbased
on 03 Aug, 2011 14:35
-
Reached 12 mm. Next check is at 5mm.
Counting down 5 min for a leak check
-
#26
by
Ronsmytheiii
on 03 Aug, 2011 14:36
-
Not much KU coverage today as Josh stated
-
#27
by
Ronsmytheiii
on 03 Aug, 2011 14:41
-
Too many voice feeds....
-
#28
by
Cbased
on 03 Aug, 2011 14:45
-
Too many voice feeds....
... and translators omitting a lot of phrases
-
#29
by
Ronsmytheiii
on 03 Aug, 2011 14:46
-
Short drop off, regulators to O2 closed
-
#30
by
Chris Bergin
on 03 Aug, 2011 14:46
-
Too many voice feeds....
Yeah. Big loop, Russian loop and the translator. All of it probably coming from the Russian feed, so not sure they can do much about it.
-
#31
by
Ronsmytheiii
on 03 Aug, 2011 14:47
-
DC is at 11.5 mm pressure
-
#32
by
Ronsmytheiii
on 03 Aug, 2011 14:50
-
opening hatch
Edit: hatch is open
-
#33
by
Ronsmytheiii
on 03 Aug, 2011 14:52
-
installing protective ring, think camera is pointed at the wrong hatch, 21 minutes behind schedule
-
#34
by
Cbased
on 03 Aug, 2011 14:53
-
The hatch was opened at 9:50am Central time.
Running 20min behind schedule
-
#35
by
Chris Bergin
on 03 Aug, 2011 14:53
-
EVA start 50 minutes past the hour - about 20 mins down.
-
#36
by
Ronsmytheiii
on 03 Aug, 2011 14:54
-
-
#37
by
Ronsmytheiii
on 03 Aug, 2011 14:56
-
Doing tool inventory
-
#38
by
Ronsmytheiii
on 03 Aug, 2011 14:58
-
GOing out to the EVA support device,a activating sublimator
-
#39
by
Cbased
on 03 Aug, 2011 15:01
-
Both cosmonauts were suits with blue stripes