-
#80
by
Ronsmytheiii
on 21 Jul, 2011 05:43
-
calling up auto maneuver to com attitude
-
#81
by
Ronsmytheiii
on 21 Jul, 2011 05:47
-
polling for payload bay door closure
weather is still go/forecast go
-
#82
by
Ronsmytheiii
on 21 Jul, 2011 05:53
-
rad bypass in work, working block 7
-
#83
by
Chris Bergin
on 21 Jul, 2011 05:54
-
She's got one final goodbye to the UK to come looking at the map.
-
#84
by
Naito
on 21 Jul, 2011 05:58
-
I know they said they'd land her at the first opportunity as always.....but won't someone please bribe the STA pilot or something to say they need to wait one more orbit? =D
-
#85
by
Ronsmytheiii
on 21 Jul, 2011 06:03
-
Go for payload bay closure in auto mode, good flash evaporator
-
#86
by
steveS
on 21 Jul, 2011 06:05
-
I know they said they'd land her at the first opportunity as always.....but won't someone please bribe the STA pilot or something to say they need to wait one more orbit? =D
yeah, one more orbit at least
-
#87
by
Ronsmytheiii
on 21 Jul, 2011 06:07
-
polling for ops 3 per PAO
-
#88
by
DwightM
on 21 Jul, 2011 06:08
-
Polling to go for Ops3 transition, the configuration of the GPC's for landing.
-
#89
by
Ronsmytheiii
on 21 Jul, 2011 06:10
-
view of KSC runway 15, looks ready for an orbiter
-
#90
by
Ronsmytheiii
on 21 Jul, 2011 06:12
-
payload bay doors closing
-
#91
by
DwightM
on 21 Jul, 2011 06:12
-
Door closure in work.
Fergy - "Houston, here comes door closure."
Butch - "We are watchin'."
-
#92
by
Chris Bergin
on 21 Jul, 2011 06:14
-
Atlantis, may your radiator retract hoses remain kink free.
-
#93
by
Ronsmytheiii
on 21 Jul, 2011 06:17
-
PAO confirms Payload bay doors are closed and latched
crew confirms nominal closing, go for OPS 3
-
#94
by
DwightM
on 21 Jul, 2011 06:18
-
Navias - "This is Mission Control Houston, for what is expected to be the final time in orbit, Atlantis' payload bay doors are closed and latched."
-
#95
by
Ronsmytheiii
on 21 Jul, 2011 06:20
-
Now working block 10 POST CLOSING CONFIG
-
#96
by
DwightM
on 21 Jul, 2011 06:21
-
Rex gives thanks to Keving McClooney, Mechanical Systems Officer, one of the 100 mission controllers. Hoping he's happy how he did the payload bay doors. Also gives thanks to the back room for those folks.
-
#97
by
Ronsmytheiii
on 21 Jul, 2011 06:25
-
Block 10 complete, block 12 in work
-
#98
by
steveS
on 21 Jul, 2011 06:27
-
Have there ever been a mission that an orbiter was running out of consumables and was in real urgency to land at the very next opportunity?
-
#99
by
DwightM
on 21 Jul, 2011 06:28
-
Block 10 complete, block 12 in work
Once this is complete, the crew will don their Launch and Entry suits. Anticipated to be within the hour.