#140
by
Ronsmytheiii
on 12 Jul, 2011 14:27
-
Mike in position to drive primary bolt, Ron has set his PGT, working on Mikes PGT settings
-
#141
by
Ronsmytheiii
on 12 Jul, 2011 14:29
-
Ron Has control of the pump module, go to release FRAM primary bolt, 11 turns
Edit Bolt released
-
#142
by
Ronsmytheiii
on 12 Jul, 2011 14:33
-
ground telling crew that need to turn the bolt again a bit to get the PM off
PGT is torquing out, asking Ron to push dwn on the PM
-
#143
by
psloss
on 12 Jul, 2011 14:33
-
-
#144
by
Ronsmytheiii
on 12 Jul, 2011 14:34
-
Bolt out, PM has been lifted off the FRAM
-
#145
by
Ronsmytheiii
on 12 Jul, 2011 14:37
-
-
#146
by
Ronsmytheiii
on 12 Jul, 2011 14:42
-
going to yaw the PM 90 degrees
-
#147
by
Ronsmytheiii
on 12 Jul, 2011 14:46
-
moving SSRMS maneuver to ESP-2 clearance position
Edit: Mike now heading to grab the crewlock bag, stopping SSRMS motion to reconfigure it.
-
#148
by
psloss
on 12 Jul, 2011 14:48
-
-
#149
by
Ronsmytheiii
on 12 Jul, 2011 14:49
-
-
#150
by
Ronsmytheiii
on 12 Jul, 2011 14:50
-
SSRMS in motion, one minute OCAS
Mike has the Crewlock bag, going down to the payload bay
-
#151
by
Ronsmytheiii
on 12 Jul, 2011 14:52
-
right on EVA timeline per PAO, going to rotate the PM 180 degrees
-
#152
by
Ronsmytheiii
on 12 Jul, 2011 14:55
-
SSRMS in motion for 7 minutes, sun coming up
-
#153
by
psloss
on 12 Jul, 2011 14:56
-
-
#154
by
Ronsmytheiii
on 12 Jul, 2011 14:57
-
-
#155
by
psloss
on 12 Jul, 2011 14:59
-
-
#156
by
Ronsmytheiii
on 12 Jul, 2011 14:59
-
-
#157
by
Ronsmytheiii
on 12 Jul, 2011 15:02
-
-
#158
by
Ronsmytheiii
on 12 Jul, 2011 15:02
-
-
#159
by
psloss
on 12 Jul, 2011 15:03
-