-
#60
by
psloss
on 11 Jul, 2011 10:36
-
-
#61
by
Ronsmytheiii
on 11 Jul, 2011 10:37
-
SAndy confused on the checklist for second stage, thinks she missed a step. Ground is checking. She figured it out, backing up in the timeline.
-
#62
by
psloss
on 11 Jul, 2011 10:39
-
-
#63
by
Chris Bergin
on 11 Jul, 2011 10:43
-
ISS just got a little bit bigger for a while
-
#64
by
Ronsmytheiii
on 11 Jul, 2011 10:45
-
The first and only time Two MPLM's have been on station at the same time (yes, the PMM is still a MPLM even if it was modified)
-
#65
by
Ronsmytheiii
on 11 Jul, 2011 10:47
-
PAO reporting second stage capture complete
-
#66
by
Chris Bergin
on 11 Jul, 2011 10:47
-
L2 now has every 400mm, 800mm, and 1000mm RPM photo! Over 600mb of images!
-
#67
by
psloss
on 11 Jul, 2011 10:57
-
-
#68
by
Ronsmytheiii
on 11 Jul, 2011 10:58
-
-
#69
by
psloss
on 11 Jul, 2011 10:58
-
Chris Ferguson and Rex Walheim now working on the recovery of GPC 3 now on the orbiter; that's outlined in MSG 028 in today's execute package.
-
#70
by
Chris Bergin
on 11 Jul, 2011 10:59
-
GPC-3 reloading has started. 30-40 minute task.
-
#71
by
Chris Bergin
on 11 Jul, 2011 11:00
-
GPC-3 now in standby. Dump on the way.
-
#72
by
Ronsmytheiii
on 11 Jul, 2011 11:00
-
-
#73
by
psloss
on 11 Jul, 2011 11:01
-
-
#74
by
Ronsmytheiii
on 11 Jul, 2011 11:02
-
-
#75
by
psloss
on 11 Jul, 2011 11:02
-
-
#76
by
psloss
on 11 Jul, 2011 11:04
-
DPS SSR-1 complete, GPC 3 memory dumped.
-
#77
by
psloss
on 11 Jul, 2011 11:04
-
-
#78
by
Ronsmytheiii
on 11 Jul, 2011 11:05
-
-
#79
by
Ronsmytheiii
on 11 Jul, 2011 11:09
-