#20
by
psloss
on 10 Jul, 2011 10:06
-
Good config for the NH burn.
-
#21
by
Chris Bergin
on 10 Jul, 2011 10:07
-
-
#22
by
psloss
on 10 Jul, 2011 10:08
-
-
#23
by
Chris Bergin
on 10 Jul, 2011 10:09
-
You could really see that kick in with the wobble on the flight deck.
-
#24
by
Chris Bergin
on 10 Jul, 2011 10:10
-
Good burn, no trim required.
-
#25
by
psloss
on 10 Jul, 2011 10:14
-
Here's where they are (generally) in the timeline, post NH burn.
-
#26
by
chksix
on 10 Jul, 2011 10:14
-
Hi Chris, your caps are squeezed a bit.
-
#27
by
psloss
on 10 Jul, 2011 10:15
-
Did a dump of GPC1, just to double-check it's ready to support; now picking up with the Enable Rendezvous Nav steps.
-
#28
by
psloss
on 10 Jul, 2011 10:18
-
NC-4 in about 37 minutes; Ti burn in a couple of hours
-
#29
by
Chris Bergin
on 10 Jul, 2011 10:18
-
Looks like Doug is doing a lot of work with the computers.
-
#30
by
psloss
on 10 Jul, 2011 10:20
-
-
#31
by
psloss
on 10 Jul, 2011 10:23
-
Rob noting temp loss of GPC3 at the time of the set expansion. May try to recover tomorrow.
As mentioned, no impact to today's events.
DPS officer noted that this same issue occurred on STS-122.
-
#32
by
psloss
on 10 Jul, 2011 10:26
-
Rob noting temp loss of GPC3 at the time of the set expansion. May try to recover tomorrow.
As mentioned, no impact to today's events.
DPS officer noted that this same issue occurred on STS-122.
Heh, Steve Robinson noting that this same occurred with the same MS2...Chris Ferguson said that Rex was telling them the story.
-
#33
by
Chris Bergin
on 10 Jul, 2011 10:26
-
HA! "I don't know what you want to make of it, but it was the same orbiter, same GPC and the same MS2"
-
#34
by
Chris Bergin
on 10 Jul, 2011 10:27
-
28 mins to the next burn.
-
#35
by
psloss
on 10 Jul, 2011 10:30
-
NC-4 burn updates:
Weight: 248252 lbs
TIG: 01/19:26:23.4 --> 10:55:27 GMT / 5:55:27 Central
TGT PEG7:
dVx: +143.9 (fps)
dVy: 0
dVz: +7.6
Same burn monitor update: 1 (2)
Max TIG slip is 2 minutes, "do not update TIG"
And delete the note.
-
#36
by
psloss
on 10 Jul, 2011 10:33
-
-
#37
by
psloss
on 10 Jul, 2011 10:39
-
-
#38
by
psloss
on 10 Jul, 2011 10:44
-
Graphic from the execute package, coming up on the NC-4 burn.
-
#39
by
Chris Bergin
on 10 Jul, 2011 10:45
-
Rob Navias noting how much effort they are making on ensuring all of Atlantis' TPS is mapped by the Station crew, given the lack of shuttle LON - whilst noting it is highly unlikely there's any damage of concern on the ship.
4hrs, 22mins to docking.