Gwynne Shotwell, President of SpaceX
(lots here)
Lucky to be president of the coolest company she knows of.
Falcon 1 program is inactive until at least early next year.
FH core almost (but not quite) full when boosters separate.
NASA wants a fresh Dragons for CRS (because of costing uncertainties), so DragonLab will all be reflights.
Insurance rates 7-8% by Flight 6.
Production rate of 12 F9s by 2013.
Sep events largest cause of failure for LVs. F9 factor of safety 1.4 (vs 1.25 for EELV).
Might have redundant engines on second stage in future!
Dragon on ship's deck within 2 hours of landing.
Abort system core of CCDEV2 proposal. People up within 3 years of starting on abort system.
Elon driving for reusability; continuing work on both first and second stage recovery.
Merlin 1D on test stand now. Still really want to build a F-1 class engine.
"We haze our lobbyists." Four new lobbyists.
1D meant to be easier to mass-produce.
Had to pay full price for her Tesla.
Trying to get to ISS on next flight, but could still have COTS3.
FH: C3=3 km2/s2 -> 12 tonnes, C3=90 km2/s2 -> 3 tonnes. Still optimizing trajectories for FH.
Lots of little customers for DragonLab, rather than few big (heading cats); first in 2013.
Really happy to launch Orbital Starbuses; rest of relationship "complex".
Did look at Falcon 1e Heavy to chase Minotaur IV; trading with manifesting on F9. Orbcomm moved 1e payloads to F9, and that put 1e on hold.
Falcon 5 is hard to control; not worth it.
5.2 meter faring on FH. Bunch of little payloads on first FH flight.
Plan is crossfeed on FH from start.
Few (very few) people still working on Raptor.
Development of abort engine long pole for crew. Still in trade whether to use parachutes nominally for propulsive landing.
Interested in electric propulsion.
10-15 years until first Mars mission.