Author Topic: Exploration Enterprise Workshop Day 1 and Day 2 Presentations released  (Read 18725 times)

Offline hutchel

  • Overzealous Enthusiast
  • Full Member
  • *
  • Posts: 104
  • Washington, DC
  • Liked: 5
  • Likes Given: 36
On page 13 of the Inflatable Module Mission document.

Node 4 (Option).


So what are we looking at to actually develop this (time/ cost) - since there are numerous documents and comments talking about inflatable and other new ISS modules on the US side.  It's obvious that this is needed (tug and Node 4) and the HTV and ATV demonstrate it's possible but obviously they have the payloads built into the vehicles.  For the future it's obvious that this is just as important as a US human rated vehicle (capsule, etc)

Online 2552

  • Full Member
  • ****
  • Posts: 486
  • Liked: 41
  • Likes Given: 519
Bump. Videos of the Day 1 presentations and Panel Q&A are up.
« Last Edit: 07/14/2010 07:38 AM by 2552 »

Tags: