#180
by
Ronsmytheiii
on 21 May, 2010 13:42
-
Garrett doing inventory of truss bag, mike is closing MLI on Battery one after egressing the aPFR, Garrett will pick up trash bag from the truss
-
#181
by
Ronsmytheiii
on 21 May, 2010 13:46
-
consumables are good EV-1 battery at 9:11 is the constraint "must not be working very hard"
MLi on foxtrot complete, give pallet a look over and will leave it, now at the APFR
-
#182
by
Ronsmytheiii
on 21 May, 2010 13:51
-
Garrett has a plan for the gap spanners, will do those and then scoops on Battery foxtrot, Mike stowing the APFR
-
#183
by
Ronsmytheiii
on 21 May, 2010 13:53
-
Garrett Working gap spanners, seems to be doing fine on his own
-
#184
by
Ronsmytheiii
on 21 May, 2010 13:57
-
ICC is clear, going to back it off with the arm, over Italy PET 3 hours 30 minutes
-
#185
by
Ronsmytheiii
on 21 May, 2010 14:00
-
Garrett has one gap spanner, going to work to remove the next. Mike was having issues with adjusting the APFR ground trying to help him, 20 minutes without KU
Arm moving ICC-VLD to clearance position
-
#186
by
Ronsmytheiii
on 21 May, 2010 14:03
-
Garrett likes his plan for the gap spanners as he got to go to the end of P6, both scoops in pallet bag, Mike will work the APFR again and then grab the scoops on Battery Foxtrot, both gap spanners now removed and stored
-
#187
by
Ronsmytheiii
on 21 May, 2010 14:07
-
APFR has been reconfigured by Mike, grabbing APFR af WFF 21 and taking it to the CETA cart
-
#188
by
Ronsmytheiii
on 21 May, 2010 14:10
-
Mike working APFR on the CETA cart orientation, has the APFR and heading out, waiting for Garrett to finish packing bags before he can continue, grabbing Garrett's spare tether
-
#189
by
Ronsmytheiii
on 21 May, 2010 14:20
-
orbit 1 handing off to orbit two, Megan McArthur now Capcom for shuttle side
-
#190
by
Ronsmytheiii
on 21 May, 2010 14:22
-
EV members done on the P6 truss, Mike will drop off APFR on the CETA cart
-
#191
by
Ronsmytheiii
on 21 May, 2010 14:27
-
-
#192
by
Ronsmytheiii
on 21 May, 2010 14:28
-
4 hours PET, gorund wants to check starboard CETA cart swing arm, EOTP MLI as get aheads in addition to PDGF fixture removal from the payload bay
-
#193
by
Ronsmytheiii
on 21 May, 2010 14:31
-
Mike installing the APFR on the port CETA cart, and it looks good
going to the starboard CETA cart to see if another APFR can move
-
#194
by
Ronsmytheiii
on 21 May, 2010 14:36
-
Garrett is working MLI on the EOTP, cheeking ability of starboard nadir WFF to swing
-
#195
by
Space Pete
on 21 May, 2010 14:39
-
The following tasks are still outstanding:
. Re-secure MLI cavity flap on EOTP Input Drive at SPDM.
. Remove & re-install P1 Truss RGFSB (Radiator Grapple Fixture Stowage Beam).
. Retrieve PDGF from PLB.
-
#196
by
Ronsmytheiii
on 21 May, 2010 14:40
-
Garrett done with MLI, helping Mike with the APFR WIFF, looks like it is sticking
-
#197
by
Ronsmytheiii
on 21 May, 2010 14:41
-
The following tasks are still outstanding:
. Re-secure MLI cavity flap on EOTP Input Drive at SPDM.
. Remove & re-install P1 Truss RGFSB (Radiator Grapple Fixture Stowage Beam).
. Retrieve PDGF from PLB.
Garrett just finished the MLI
Going to give up on the APFR and go do the PDGF retrieval
-
#198
by
Ronsmytheiii
on 21 May, 2010 14:45
-
11 minutes to sunrise, Mike and Garrett are translating to the payload bay of Atlantis, Garrett will temp stow bags while they grab the PDGF
-
#199
by
Ronsmytheiii
on 21 May, 2010 14:57
-
Garrett now on Atlantis. as well as Mike, looking in the flight deck deck windows
Funniest shuttle crew I have seen