#80
by
Ronsmytheiii
on 19 May, 2010 11:18
-
-
#81
by
Ronsmytheiii
on 19 May, 2010 11:20
-
seems that during pitch maneuver gets hung up, pan is fine
-
#82
by
psloss
on 19 May, 2010 11:20
-
Looks like they're here in the procedures from today's execute package:
A7 CAMR CMD PAN/TILT - LO RATE
CAMR CMD TILT - UP (to hard stop)
CAMR CMD PAN - L (to hard stop)
CAMR CMD PAN/TILT - RESET
CAMR CMD PAN/TILT - HI RATE
CAMR CMD TILT - DN (to hard stop)
CAMR CMD PAN - R (to hard stop)
Record Pan/Tilt values and report to MCC:
Pan _____ / Tilt ______
When test complete,
If additional repair necessary: repeat step 3
If no additional repair necessary: Notify EV, GO for APFR Egress
-
#83
by
Ronsmytheiii
on 19 May, 2010 11:23
-
Steve is going to work to fix tab limiting pan function, seems a different tie down is the problem
-
#84
by
Chris Bergin
on 19 May, 2010 11:24
-
Tilt is ok (which was originally the proble). Pan needs improving.
-
#85
by
Ronsmytheiii
on 19 May, 2010 11:26
-
Good is working on the second APFR, ground thinking it over
-
#86
by
psloss
on 19 May, 2010 11:26
-
Tilt is ok (which was originally the proble). Pan needs improving.
Sounded like a different tie-wrap is restricting the pan. IV says inhibits are in place for hands-on. Beginning to GCA back in.
-
#87
by
Ronsmytheiii
on 19 May, 2010 11:27
-
-
#88
by
Ronsmytheiii
on 19 May, 2010 11:30
-
tie wrap, think it is too tight and they should replace with a looser one, Houston thinks it is good, ready for Steve to go out to P6
-
#89
by
psloss
on 19 May, 2010 11:30
-
Ground says the cable config is good enough, no more changes necessary.
They think that any snags caused by this other tie-wrap moving around can be freed by moving the PTU (which would move the tie-wrap).
-
#90
by
Ronsmytheiii
on 19 May, 2010 11:31
-
Believe they can get it loose by just panning and tilting, OBSS moving away,
-
#91
by
Ronsmytheiii
on 19 May, 2010 11:32
-
Good and APFR at WFF 12, installing it, Bowen storing the APFR he used on the boom
-
#92
by
Ronsmytheiii
on 19 May, 2010 11:35
-
Bowen giving glove check, then heading out to the battery install site, both gloves good, port arrays inhibited
-
#93
by
Ronsmytheiii
on 19 May, 2010 11:37
-
-
#94
by
Ronsmytheiii
on 19 May, 2010 11:38
-
-
#95
by
Ronsmytheiii
on 19 May, 2010 11:42
-
Steve heading to get the pallet bag, ratty comm for next 20minutes, Good and Bowen out at P6 to work battery change outs
-
#96
by
Ronsmytheiii
on 19 May, 2010 11:45
-
putting away the bag used for the OBSS troubleshooting, in the ZOE (Zone of Exclusion)
-
#97
by
Ronsmytheiii
on 19 May, 2010 11:48
-
breaking torque on H1 bolt on first battery
-
#98
by
Ronsmytheiii
on 19 May, 2010 11:52
-
Good on battery 3, breaking bolt torques, Bowen has stored bag, going to his APFR, Tony ants to use OBSS camera to monitor EVA
-
#99
by
kraisee
on 19 May, 2010 11:53
-
Crikey, that makes a Prius battery look small !
Ross.