-
#60
by
chksix
on 19 May, 2010 10:47
-
Are they working without helmet lights?
-
#61
by
Ronsmytheiii
on 19 May, 2010 10:48
-
Mike Good exiting the airlock with the truss bag
-
#62
by
arkaska
on 19 May, 2010 10:51
-
After the egress Steve will start working on the snagged cable on the OBSS, he will translate to the truss and ingress an APFR and then the OBSS will come to him.
Goods task will look a little bit different since Steve is of working on the OBSS. For the battery task they each need a APFR and from the beginning it was planned that they would each install their own APFR. Now Good will take care of both his and Steves APFR while Steve is working on the OBSS.
-
#63
by
Ronsmytheiii
on 19 May, 2010 10:51
-
Checking tabs, SAFER handles, and tether locks, Steve heading out to CETA cart, Good closing thermal cover
-
#64
by
Ronsmytheiii
on 19 May, 2010 10:52
-
good will get a bad volt decay message in a bit, thermal cover is closed
CETA cart and the APFR with OBSS in foreground
-
#65
by
Ronsmytheiii
on 19 May, 2010 10:54
-
Steve is at the CETA cart:
-
#66
by
Ronsmytheiii
on 19 May, 2010 10:55
-
Setting up APFR to position to work on OBSS, Good had bad volt message as expected, inhibits in place, APFR will not move, want to pitch it differently
-
#67
by
Ronsmytheiii
on 19 May, 2010 10:59
-
tether has stuck around Good, Bowen trying to help him work out of it
-
#68
by
Ronsmytheiii
on 19 May, 2010 11:00
-
Bowen moved a different AFPR in position, in SSV mode right now
-
#69
by
Ronsmytheiii
on 19 May, 2010 11:02
-
KU returns, working APFR angles
-
#70
by
Ronsmytheiii
on 19 May, 2010 11:05
-
Bowen ingressing the APFR,
-
#71
by
Ronsmytheiii
on 19 May, 2010 11:07
-
Moving the OBSS to work envelope
-
#72
by
Ronsmytheiii
on 19 May, 2010 11:08
-
calling up caution, WVS survey, good on unsnagging, now done
-
#73
by
arkaska
on 19 May, 2010 11:09
-
Lots of motion in the OBSS
-
#74
by
Ronsmytheiii
on 19 May, 2010 11:09
-
-
#75
by
Chris Bergin
on 19 May, 2010 11:12
-
Lots of motion in the OBSS
There really is! But it looks like he's got it under control.
-
#76
by
Ronsmytheiii
on 19 May, 2010 11:14
-
done, backing away arm to test fix
-
#77
by
Ronsmytheiii
on 19 May, 2010 11:14
-
meanwhile Bowen working on APFR setup
-
#78
by
Ronsmytheiii
on 19 May, 2010 11:16
-
talking some cable interference, but going to see if the test is successful
-
#79
by
Ronsmytheiii
on 19 May, 2010 11:18
-