-
#40
by
haywoodfloyd
on 18 May, 2010 11:12
-
Are they controlling the SSRMS from the cupola?
-
#41
by
Ronsmytheiii
on 18 May, 2010 11:13
-
Waiting to fly over Russian ground stations before docking the MRM-1, next maneuver loaded
-
#42
by
MKremer
on 18 May, 2010 11:15
-
Are they controlling the SSRMS from the cupola?
No, just monitoring, I think. The full workstation still hasn't been transferred to the cupola yet.
-
#43
by
MKremer
on 18 May, 2010 11:17
-
MCC-H just said 10-min LOS, but still go to drive the module to capture?
-
#44
by
Chris Bergin
on 18 May, 2010 11:18
-
And they are ahead of schedule as this event was for 50 minutes past the hour.
-
#45
by
Ronsmytheiii
on 18 May, 2010 11:18
-
-
#46
by
MKremer
on 18 May, 2010 11:20
-
Yes it has, the crew is controlling SSRMS from the Cupola
Didn't note that, read that they're only monitoring and giving cues with a single laptop in the Cupola.
-
#47
by
Ronsmytheiii
on 18 May, 2010 11:22
-
Go for Maneuver to dock viewing position for SRMS
-
#48
by
Ronsmytheiii
on 18 May, 2010 11:25
-
SRMS in viewing position
-
#49
by
MKremer
on 18 May, 2010 11:25
-
-
#50
by
Ronsmytheiii
on 18 May, 2010 11:28
-
-
#51
by
Ronsmytheiii
on 18 May, 2010 11:30
-
IMU align on 1 and 2, transferring caution and warning data from station to shuttle
-
#52
by
Chris Bergin
on 18 May, 2010 11:31
-
view of MRM-1 probe
That's key too. The main contingency relates to that (writing an article):
"In the event MRM-1 cannot be installed and the docking probe cannot be sufficiently retracted, EVA removal of the docking system will be required to return the module to the payload bay."
-
#53
by
MKremer
on 18 May, 2010 11:33
-
Still waiting for the docking probe to be extended, though.
-
#54
by
Ronsmytheiii
on 18 May, 2010 11:34
-
Telemetry showing a dm off on docking ring, going to take a 5 minute break but leaving SSRMS brakes off
-
#55
by
Fuji
on 18 May, 2010 11:35
-
Are they controlling the SSRMS from the cupola?
No, just monitoring, I think. The full workstation still hasn't been transferred to the cupola yet.

I think Cuppola RWS has already transferred and functional.
-
#56
by
Ronsmytheiii
on 18 May, 2010 11:38
-
-
#57
by
MKremer
on 18 May, 2010 11:39
-
Are they controlling the SSRMS from the cupola?
No, just monitoring, I think. The full workstation still hasn't been transferred to the cupola yet.
I think Cuppola RWS has already transferred and functional.
I didn't note that. That's a Big Deal for ISS, figured it would have been given more attention in the spaceflight press or even in here.
-
#58
by
Ronsmytheiii
on 18 May, 2010 11:41
-
I didn't note that. That's a Big Deal for ISS, figured it would have been given more attention in the spaceflight press or even in here. 
-
#59
by
Jason Davies
on 18 May, 2010 11:41
-
Are they controlling the SSRMS from the cupola?
No, just monitoring, I think. The full workstation still hasn't been transferred to the cupola yet.
I think Cuppola RWS has already transferred and functional.
I didn't note that. That's a Big Deal for ISS, figured it would have been given more attention in the spaceflight press or even in here. 
It was, numerous times.