-
#80
by
Ronsmytheiii
on 17 May, 2010 12:39
-
Steven Bowen moving back to bolt one to break torque, 4 minutes to sunset, black on black for Garret Reismans APFR on the SSRMS
-
#81
by
Ronsmytheiii
on 17 May, 2010 12:45
-
Steven Bowen has set up his APFR on the ISS-VLD, going to ingress his APFR
-
#82
by
Ronsmytheiii
on 17 May, 2010 12:47
-
Garrett giving glove inspection before releasing SGANT boom bolts, good pull test
-
#83
by
Ronsmytheiii
on 17 May, 2010 12:50
-
releasing bolts, 17 turns Steve also working bolts
-
#84
by
Ronsmytheiii
on 17 May, 2010 12:54
-
a couple of bolts with less turns than expected to release, but still ok
having problems releasing one, using manual ratchet, steve bowen breaks torque
-
#85
by
Ronsmytheiii
on 17 May, 2010 12:56
-
Steve Bowen at boom release position, going to do the last bolt then doing glove inspection
-
#86
by
Ronsmytheiii
on 17 May, 2010 12:57
-
steve stowing PGT, last bolt loose, boom now soft docked, completely out now,Bowen has the boom
-
#87
by
Ronsmytheiii
on 17 May, 2010 12:59
-
PET 1hour, ahead of the timeline, Garrett entering his APFR on the SSRMS
-
#88
by
Ronsmytheiii
on 17 May, 2010 13:02
-
Garrett in APFR, going to move arm out, Handing SGANT boom from Steve to Garrrett, has the boom now
-
#89
by
Ronsmytheiii
on 17 May, 2010 13:06
-
Now with the SGANT boom, Garrett will be maneuvered on the end of the arm to the Z1 truss to install the boom, Steve Bowen will work ETOP on ICC-VLD
-
#90
by
Ronsmytheiii
on 17 May, 2010 13:10
-
Steve Bowen working bolts on ETOP, will move it to soft dock position
clear to move the arm
-
#91
by
Ronsmytheiii
on 17 May, 2010 13:12
-
Steve will now clean up the ICC and grab APFR, then head off to Z1, z1 inhibits in place, 6 minutes to sunrise
-
#92
by
Ronsmytheiii
on 17 May, 2010 13:16
-
SSV from the Kibo arm, Bowen translating, Garrett translating on SSRMS
-
#93
by
Ronsmytheiii
on 17 May, 2010 13:19
-
-
#94
by
Ronsmytheiii
on 17 May, 2010 13:21
-
Sete at the Ceta cart, garret still holding on
-
#95
by
Ronsmytheiii
on 17 May, 2010 13:23
-
-
#96
by
Ronsmytheiii
on 17 May, 2010 13:23
-
Boom in position for instillation, Bueno going to take pictures of Garrett, Steve done with APFR
-
#97
by
Ronsmytheiii
on 17 May, 2010 13:27
-
Good glove check on Steve, he is going to head to airlock toolbox to retrieve SGANT bag, Garrett waiting in position, going to GCA in closer
-
#98
by
Ronsmytheiii
on 17 May, 2010 13:31
-
SGANT bag on Steve's BRT, going to get a battery volt decay message soon
Garrett mixing up nadir and zenith, Piers corrects him, GCA in closer, now waiting on Steve
-
#99
by
Ronsmytheiii
on 17 May, 2010 13:33
-
Steve going to leave SGANT bag on Z1 forward, moving connector out of the way of the instillation point