-
#220
by
Ronsmytheiii
on 17 May, 2010 18:49
-
Garrett heading to help steve, need to make-sure tethers are out of the way fo the MBS as it needs to move to support EVA-2, Garrett checking Steve's WVS
-
#221
by
Ronsmytheiii
on 17 May, 2010 18:53
-
Steve heading back to the airlock now, Garrett now joining him.
-
#222
by
Ronsmytheiii
on 17 May, 2010 18:55
-
-
#223
by
Ronsmytheiii
on 17 May, 2010 18:59
-
putting bags in the airlock, Bowen's waist tether is on the D-ring, now entering the airlock
-
#224
by
Ronsmytheiii
on 17 May, 2010 19:07
-
thermal cover is closed
-
#225
by
Ronsmytheiii
on 17 May, 2010 19:11
-
water is off, scu on
-
#226
by
Ronsmytheiii
on 17 May, 2010 19:12
-
outer hatch is clear, need to wait to close it though
-
#227
by
Ronsmytheiii
on 17 May, 2010 19:18
-
Hatch closed and locked, Ken Ham in control now
-
#228
by
Ronsmytheiii
on 17 May, 2010 19:24
-
Airlock repressurization, 7 hours 25 minutes total time
And with that I bid you adieu
-
#229
by
Chris Bergin
on 17 May, 2010 19:27
-
Stunning work with the coverage Ron.
MSB/Post MMT at the top of the hour I believe. I'll transcribe that.
If we could keep an eye on interim screenshots/updates of interest, it'd be appreciated as I finish the launch preview for the JAXA launch.
-
#230
by
stockman
on 17 May, 2010 19:31
-
-
#231
by
Space Pete
on 17 May, 2010 19:33
-
Awesome coverage, Ron!
-
#232
by
stockman
on 17 May, 2010 19:36
-
-
#233
by
stockman
on 17 May, 2010 19:37
-
back inside the a/l - detailing pictures of the gloves
-
#234
by
stockman
on 17 May, 2010 19:40
-
-
#235
by
stockman
on 17 May, 2010 19:44
-
-
#236
by
stockman
on 17 May, 2010 19:46
-
-
#237
by
stockman
on 17 May, 2010 19:51
-
-
#238
by
stockman
on 17 May, 2010 19:53
-
-
#239
by
stockman
on 17 May, 2010 20:03
-
cleaning up after the spacewalk in the a/l