#140
by
psloss
on 17 May, 2010 15:14
-
Consumables: EV-2, O2, to 7:14.
EVA-1 is on time, Steve a little ahead. Garrett a little behind.
Talking limiting consumables; as Tony said, he doesn't want (the next EVAs) to have to go back to Z1.
Second limiting one was LiOH for one of the EV crew at 7:56 PET.
-
#141
by
Chris Bergin
on 17 May, 2010 15:14
-
Asking what they should do.
"You should enjoy being in space, on a spacewalk, with a camera and a view."
-
#142
by
psloss
on 17 May, 2010 15:16
-
Now talking "bingo" time -- need to start (Antenna Group Interface Tube / AGIT) heat shield task by 4:20 PET. (Currently at 3:20.)
-
#143
by
Chris Bergin
on 17 May, 2010 15:16
-
Bingo time is to get to the heatshield by PET 4:20
-
#144
by
Chris Bergin
on 17 May, 2010 15:17
-
-
#145
by
psloss
on 17 May, 2010 15:20
-
Great view
Those stills should be spectacular.
-
#146
by
Chris Bergin
on 17 May, 2010 15:20
-
-
#147
by
Ronsmytheiii
on 17 May, 2010 15:21
-
Working on bolts on the SGANT boom
-
#148
by
Chris Bergin
on 17 May, 2010 15:22
-
I'm right next to the sun
-
#149
by
Chris Bergin
on 17 May, 2010 15:25
-
-
#150
by
Ronsmytheiii
on 17 May, 2010 15:27
-
-
#151
by
psloss
on 17 May, 2010 15:28
-
Working on bolts on the SGANT boom
For those following along in the EVA FDF, this is from 7-16; a step that could be done before getting into the dish steps.
CONNECT DISH CABLES TO BOOM
75. Remove connector caps from boom J1 and J2
-
#152
by
Chris Bergin
on 17 May, 2010 15:31
-
Finite robotics, no Ku.
-
#153
by
psloss
on 17 May, 2010 15:35
-
GCA complete, Bowen working the bolts; here's his steps, also on 7-16:
INSTALL DISH ONTO BOOM
70. GCA EV1 to install position
71. Assist EV1 with fine alignment of dish
72. Hand tighten bolt 1, wave guide bolt
73. PGT[B1 (12.0), CW2] – 6-in ext-7/16: Drive bolts to hard
stop; expect 8 turns
.. Bolt 1 Torque: ______ Turns: ______
.. Bolt 3 Torque: ______ Turns: ______
.. Bolt 2 Torque: ______ Turns: ______
-
#154
by
Chris Bergin
on 17 May, 2010 15:35
-
Working on another bolt. Five turns.
-
#155
by
Chris Bergin
on 17 May, 2010 15:38
-
Might go back to Bolt 1 to get it torqued.
-
#156
by
Chris Bergin
on 17 May, 2010 15:38
-
Asked the retorque all three bolts, same settings as before.
-
#157
by
Chris Bergin
on 17 May, 2010 15:41
-
10:39am Central for the bolting of the antenna.
-
#158
by
Chris Bergin
on 17 May, 2010 15:41
-
Dextre task up next.
-
#159
by
psloss
on 17 May, 2010 15:44
-
Garrett working on this section on 7-16:
40. Remove 6-in socket from PGT, stow in trash bag
41. Receive ERAD from EV2, install on PGT
.. Pull test
42. PGT[A5 (7.0), CW2] – ERAD 2-in ext-7/16: Secure bolt 4;
expect 4 turns at PGT
Torque: ______ Turns: ______
43. Stow PGT
44. Release RET from Dish
Just heard Tony calling out the PGT settings in step 42, expect slightly different number of turns.