#100
by
Ronsmytheiii
on 17 May, 2010 13:36
-
Steve finally got the battery decay message as expected, bag stowed on the truss, verifying install site is clear of FOD
-
#101
by
Ronsmytheiii
on 17 May, 2010 13:39
-
-
#102
by
Ronsmytheiii
on 17 May, 2010 13:43
-
Bowen going to drive the bolts on the boom, torquing out so going out, but clocking out again
-
#103
by
Ronsmytheiii
on 17 May, 2010 13:44
-
increasing torque, bravo 7 clockwise 2, looks good
green light 29 turns, going aft
Going to GCA away from the boom
-
#104
by
Ronsmytheiii
on 17 May, 2010 13:49
-
Garrett has nothing to do for an hour and a half but take pictures, Steve working bolts on SGANT boom, Piers going to GCA Reisman away from boom, Houston wants to make sure boom engaged as did not get all turns, Steve says it is solid
Garrett now clear of boom, going to move back to the ICC-VLD on the SSRMS
-
#105
by
Ronsmytheiii
on 17 May, 2010 13:54
-
good glove inspection for steve, he was working with the SGANT bag, Garrett has good gloves as well
-
#106
by
Ronsmytheiii
on 17 May, 2010 14:01
-
Steve working connectors for the SGANT on the Z1
Garrett commenting on his height Tony " your 2/3 of the way to being a Hubble guy"
-
#107
by
Ronsmytheiii
on 17 May, 2010 14:02
-
Garrett : I can do inspection from up here
Steve installed 254
-
#108
by
Ronsmytheiii
on 17 May, 2010 14:06
-
arm having a error message, Steve going to do a WVS survey
-
#109
by
Ronsmytheiii
on 17 May, 2010 14:10
-
transition of c&c computer, so that is why arm is in safe mode
-
#110
by
Ronsmytheiii
on 17 May, 2010 14:14
-
10 minutes to recover robotics, have plenty for Bowen to do and Tony is keeping Garrett entertained out of the window
steve going to continue work on connectors, was some issue verifying inhibits on Z1
-
#111
by
Ronsmytheiii
on 17 May, 2010 14:15
-
-
#112
by
Chris Bergin
on 17 May, 2010 14:20
-
Connector released, although there was a "what's that?" call.
-
#113
by
Chris Bergin
on 17 May, 2010 14:20
-
J2 in place.
-
#114
by
psloss
on 17 May, 2010 14:20
-
transition of c&c computer, so that is why arm is in safe mode
I believe Kyle Herring said it was one of the station MDMs that had a failure. (Edit: not exactly sure where the issue is; doesn't sound like the MDM, either.) Not an issue with the C&C computer, but lost power to some station systems and that's the work going on right now from the ground.
-
#115
by
Chris Bergin
on 17 May, 2010 14:22
-
J3 cap tied. J3 connector - good pins.
-
#116
by
Chris Bergin
on 17 May, 2010 14:24
-
J3 complete as EVA-1 heads past 2hrs 30 minutes.
-
#117
by
Chris Bergin
on 17 May, 2010 14:27
-
Steve nearly complete with the stowed connectors ready for transition.
-
#118
by
Chris Bergin
on 17 May, 2010 14:29
-
Transition of robotic screens after the MDM noticed an issue with the C&C complete. Piers configuring the screens.
-
#119
by
Chris Bergin
on 17 May, 2010 14:34
-
Arm back into motion following C&C back up.