-
#180
by
Ronsmytheiii
on 16 May, 2010 14:42
-
ready to work step 14, PMA-2 hooks latched, 20 minute timer started
-
#181
by
Ronsmytheiii
on 16 May, 2010 14:45
-
puting block 22a in work, no deltas
-
#182
by
bodge
on 16 May, 2010 14:45
-
Just a nit, but only the ODS hooks latch, the pma-2 hooks are only put in an active configuration in contingency situations.
-
#183
by
GoForTLI
on 16 May, 2010 14:46
-
-
#184
by
Ronsmytheiii
on 16 May, 2010 14:47
-
-
#185
by
Ronsmytheiii
on 16 May, 2010 14:49
-
-
#186
by
kneecaps
on 16 May, 2010 14:49
-
TERMINATE RENDZ OPS should be in work (or even done by now). Block 22A on page 4-22. After that return to the timeline which can be found in todays execute package.
-
#187
by
kneecaps
on 16 May, 2010 14:52
-
Ratty comm from 32 to 53. Go to manoeuvre to -XLV -ZVV as called out in the flight plan.
-
#188
by
Ronsmytheiii
on 16 May, 2010 14:54
-
-
#189
by
GoForTLI
on 16 May, 2010 14:55
-
Ratty comm from 32 to 53. Go to manoeuvre to -XLV -ZVV as called out in the flight plan.
How long does it usually take to turn the complex around?
-
#190
by
Ronsmytheiii
on 16 May, 2010 14:58
-
Soichi working hatch opening procedures , going to open Noe 2 forward hatch
-
#191
by
Ronsmytheiii
on 16 May, 2010 15:03
-
tracy is going to start routing cables to get ahead, Fan active on Atlantis side for ODS
-
#192
by
GoForTLI
on 16 May, 2010 15:06
-
In the maneuver to -XLV -ZVV. I didn't realize there is also a roll involved in the maneuver (if I'm looking at the graphic correctly).
-
#193
by
Ronsmytheiii
on 16 May, 2010 15:08
-
Node 2 forward hatch is open
-
#194
by
Ronsmytheiii
on 16 May, 2010 15:14
-
waiting for Vestibule to be pressurized before starting 10minute clock
-
#195
by
Ronsmytheiii
on 16 May, 2010 15:16
-
Airlock prep for ingress complete
-
#196
by
Ronsmytheiii
on 16 May, 2010 15:21
-
step 20 of station leak check is complete, shuttle side going to use station cameras for inspection for 5 minutes
-
#197
by
GoForTLI
on 16 May, 2010 15:26
-
DAT will have 398 images to look at from the RPM.
149 additional shots from Tracy, targeting the upper WLE, plus the planned images totaled 249 this time (115 400mm and 134 800mm).
Am I missing someone? Thought we had 4 crewmembers taking photos.
-
#198
by
Ronsmytheiii
on 16 May, 2010 15:30
-
picking up with group b power down
-
#199
by
GoForTLI
on 16 May, 2010 15:33
-
Maneuver complete. MCC-H ready for AUTO on the DAP.