#60
by
Orbiter
on 15 May, 2010 13:31
-
'I'll continue blaming Piers' heh, funny crew.
OBSS Cam tilting around now.
Orbiter
-
#61
by
Ronsmytheiii
on 15 May, 2010 13:31
-
think gimbal on the OBSS is messing up (cue BSG), also resett wont get them back to 0 on all
-
#62
by
Ronsmytheiii
on 15 May, 2010 13:32
-
-
#63
by
Ronsmytheiii
on 15 May, 2010 13:37
-
They found the orbiter! still having issues with the hard stop
-
#64
by
Ronsmytheiii
on 15 May, 2010 13:40
-
at hard stop on two axis, thinking about moving arm so that they can see the sensor package
-
#65
by
Ronsmytheiii
on 15 May, 2010 13:44
-
went right all the way, tilting down to see structure, no joy, going to stay where at to discuss, might use sensor package 2 and not do any pan-tilt
-
#66
by
GoForTLI
on 15 May, 2010 13:48
-
I'm looking for my copy of the detailed timeline. How much of a hit have we taken so far?
-
#67
by
Ronsmytheiii
on 15 May, 2010 13:50
-
trying to correct with wrist roll
-
#68
by
Ronsmytheiii
on 15 May, 2010 13:54
-
taking time with maneuver, have 41 inches of clearance
-
#69
by
kneecaps
on 15 May, 2010 13:56
-
I'm looking for my copy of the detailed timeline. How much of a hit have we taken so far?
They would be well into the STBD wing survey by now usually. At least half way through it. About 1.5 hours down on timeline for this activity.
-
#70
by
Ronsmytheiii
on 15 May, 2010 13:58
-
cameras delta, charlie, and elbow can see the end now
-
#71
by
Ronsmytheiii
on 15 May, 2010 13:59
-
getting pictures, if they do not resolve quickly will just use package 2
-
#72
by
Ronsmytheiii
on 15 May, 2010 14:02
-
going to watch the pan and tilt, 2 minutes to TDRSS handover
-
#73
by
Ronsmytheiii
on 15 May, 2010 14:06
-
pan and tilt worked going right, went down and then stopped, numbers and movement stopped, did not see anything hanging up but not in daylight so cannot see cables, going to try to use the high intensity light
-
#74
by
Ronsmytheiii
on 15 May, 2010 14:12
-
-
#75
by
Ronsmytheiii
on 15 May, 2010 14:19
-
Maneuver plan, want to preserve thermal clock on ICC-VLD, still want to troubleshoot sensor package in daylight
-
#76
by
Ronsmytheiii
on 15 May, 2010 14:23
-
Maneuvering, good comm/suit data from EV1, 15 minute hold till sunlight, going to do cryo heater sensor check, fuel cell purge are going to be done now to buy some time later
-
#77
by
Ronsmytheiii
on 15 May, 2010 14:30
-
cryo heater sensor check complete, going on to fuel cell purge
-
#78
by
GoForTLI
on 15 May, 2010 14:41
-
Going to wait for daylight and Ku and then see if can do the scans as-is. Plan B is to go to sensor package 2. Ku available in less than 10 minutes.
-
#79
by
Ronsmytheiii
on 15 May, 2010 14:43
-
fuel cell purge complete, waiting on bake out, Tony will get a 20 minute break as they trouble shoot OBSS