-
#100
by
Ronsmytheiii
on 15 May, 2010 15:57
-
maneuvering to inspection attitude
-
#101
by
GoForTLI
on 15 May, 2010 16:01
-
Going to kick the scan off right at orbital sunrise. Crew will be ready to go as soon as the sun comes up.
-
#102
by
Ronsmytheiii
on 15 May, 2010 16:01
-
Discussing plan with OBSS, will come up with illumination on night pass, ready to kick off at sunset, will be an hour and 15 minute scan, sill be partially in nighttime
-
#103
by
GoForTLI
on 15 May, 2010 16:06
-
...and here comes the sun. MCC-H is GO.
-
#104
by
Ronsmytheiii
on 15 May, 2010 16:07
-
sunlight is being visible, moving arm
-
#105
by
Ronsmytheiii
on 15 May, 2010 16:10
-
one minute to TDRSS handover
-
#106
by
bodge
on 15 May, 2010 16:10
-
Any word on if the PTU issue will impact OBSS boom stow?
-
#107
by
Ronsmytheiii
on 15 May, 2010 16:11
-
Bueno go to terminate EV suit battery charge
-
#108
by
GoForTLI
on 15 May, 2010 16:11
-
Getting started with the starboard wing survey about 3 hours late. Will also take longer to complete using Sensor Package 2. Crew already did some items from later in the timeline to help.
-
#109
by
Ronsmytheiii
on 15 May, 2010 16:14
-
-
#110
by
GoForTLI
on 15 May, 2010 16:32
-
Orbit 2 controllers beginning the handover from the Orbit 1 team.
-
#111
by
Ronsmytheiii
on 15 May, 2010 16:35
-
-
#112
by
Chris Bergin
on 15 May, 2010 16:42
-
Trying to catch up time.
"Being hard to push the ropes so we don't miss the daylight".
-
#113
by
Ronsmytheiii
on 15 May, 2010 16:43
-
want to load nosecap survey, do not think they can get to attitude by next daylight
-
#114
by
Ronsmytheiii
on 15 May, 2010 16:52
-
moving to nosecap survey attitude, two minutes to TDRSS handover
-
#115
by
Ronsmytheiii
on 15 May, 2010 17:00
-
-
#116
by
Ronsmytheiii
on 15 May, 2010 17:04
-
middeck transfer prep complete
-
#117
by
GoForTLI
on 15 May, 2010 17:08
-
middeck transfer prep complete
MS2 will move into PBA (Portable Breathing Apparatus) prep next.
-
#118
by
GoForTLI
on 15 May, 2010 17:09
-
About 26 minutes until orbital sunrise. Crew can crank the IDC no sooner that 5 minutes prior.
-
#119
by
GoForTLI
on 15 May, 2010 17:13
-
MSB coming up at 1300 CDT (1800 GMT). Orbit 1 FD Mike Sarafin will brief.
MMT meets at the same time. LeRoy Cain will do the post-MMT press briefing, currently targeted for 1500 CDT (2000 GMT).