-
#240
by
Chris Bergin
on 14 May, 2010 18:15
-
Go for APU Start.
-
#241
by
Ronsmytheiii
on 14 May, 2010 18:15
-
-
#242
by
kneecaps
on 14 May, 2010 18:16
-
Purge Sequence 4.
-
#243
by
Chris Bergin
on 14 May, 2010 18:16
-
Go for Purge Sequence 4.
-
#244
by
kneecaps
on 14 May, 2010 18:16
-
Aerosurface profile and MPS gimbal checks in work.
-
#245
by
Chris Bergin
on 14 May, 2010 18:17
-
Aerosurface profile checks.
SSME Gimbal checks.
-
#246
by
Ronsmytheiii
on 14 May, 2010 18:17
-
-
#247
by
Chris Bergin
on 14 May, 2010 18:17
-
T-3 minutes. SSMEs in Start position.
ET LO2 Pressurization.
-
#248
by
Ronsmytheiii
on 14 May, 2010 18:17
-
-
#249
by
Chris Bergin
on 14 May, 2010 18:17
-
GOX Vent Hood Retract.
-
#250
by
Chris Bergin
on 14 May, 2010 18:18
-
Close and lock visors.
-
#251
by
Chris Bergin
on 14 May, 2010 18:18
-
ET LH2 Pressurization.
-
#252
by
Ronsmytheiii
on 14 May, 2010 18:19
-
-
#253
by
Chris Bergin
on 14 May, 2010 18:19
-
T-60 seconds.
-
#254
by
Chris Bergin
on 14 May, 2010 18:19
-
T-31 Seconds: GO for Auto Sequence Start.
God Speed Atlantis.
-
#255
by
Chris Bergin
on 14 May, 2010 18:20
-
GO for SSME Start
-
#256
by
Chris Bergin
on 14 May, 2010 18:20
-
LAUNCH!!!
-
#257
by
Chris Bergin
on 14 May, 2010 18:20
-
Pitch and Roll.
-
#258
by
Chris Bergin
on 14 May, 2010 18:20
-
Atlantis heads down wings level.
-
#259
by
Chris Bergin
on 14 May, 2010 18:21
-
Throttling down. Into the bucket.