#180
by
Ronsmytheiii
on 14 May, 2010 16:51
-
looks like the closeout crew is working on the carrier panel
-
#181
by
Ronsmytheiii
on 14 May, 2010 16:54
-
working OMS GN2 prep, and complete
t-minus 30 minutes and counting
-
#182
by
Ronsmytheiii
on 14 May, 2010 16:58
-
carrier panel installed, window cover removed
-
#183
by
Ronsmytheiii
on 14 May, 2010 17:01
-
Judging by the over exposed image, I would imagine that the white room is being broken down, entire crew comm check
-
#184
by
psloss
on 14 May, 2010 17:01
-
Only ascent checklist update was to throttle bucket: throttle down at M 0.64, throttle up at M 1.13.
-
#185
by
Ronsmytheiii
on 14 May, 2010 17:04
-
White room configuration for launch complete, completing verification
-
#186
by
Ronsmytheiii
on 14 May, 2010 17:04
-
t minus 20 minutes and holding, L minus 1 hour 15 minutes
White room final verification complete
-
#187
by
psloss
on 14 May, 2010 17:11
-
T-20 NTD briefing coming up.
-
#188
by
Ronsmytheiii
on 14 May, 2010 17:12
-
NTD performing T-20 minute briefing
-
#189
by
psloss
on 14 May, 2010 17:14
-
NTD performing T-20 minute briefing
Window open: 18:15:09 GMT
Window close: 18:25:10 GMT
LOX drainback hold time is 5 minutes, 00 seconds, based on engine performance.
Window open and LOX drainback hold time may be updated in hold at T-9. (The window open will be updated to target in-plane T-0.)
No cutouts or COLAs.
(Edit -- fixed window open time.)
-
#190
by
Ronsmytheiii
on 14 May, 2010 17:14
-
T minus 20 minutes and counting, L minus 1 hour 5 minutes
-
#191
by
Ronsmytheiii
on 14 May, 2010 17:16
-
talking with Mike Leinbach
-
#192
by
Chris Bergin
on 14 May, 2010 17:17
-
Not sure if it was listed, but there's a LCC waiver on a crack seen on the ET, but it's not in foam liberation area - per Mike L.
-
#193
by
psloss
on 14 May, 2010 17:18
-
Mike Leinbach reports countdown smooth, weather looks good, only processed a waiver on a small foam crack, understood condition (on an articulating joint).
Will keep watching weather in case they get unlucky and something pops up over the water.
-
#194
by
Chris Bergin
on 14 May, 2010 17:19
-
L-60 minutes.
-
#195
by
kneecaps
on 14 May, 2010 17:22
-
MPS Helium Reconfig just worked. Top of 1-11 on the ASC Checklist.
-
#196
by
Ronsmytheiii
on 14 May, 2010 17:23
-
loading fuel cells, SRO informed that the KSC area is clear for launch
-
#197
by
Ronsmytheiii
on 14 May, 2010 17:26
-
t minus 9 minutes and holding for 40 minutes, L minus 54 minutes
-
#198
by
kneecaps
on 14 May, 2010 17:29
-
GPC Dump and compare was called complete a few minutes ago. This basically compares Atlantis' onboard software with a copy on the ground to ensure that everything is correct.
-
#199
by
psloss
on 14 May, 2010 17:30
-
loading fuel cells, SRO informed that the KSC area is clear for launch
Just to be clear, that was probably the fuel cell load adjust step.