-
#140
by
Ronsmytheiii
on 25 May, 2010 02:53
-
t minus 5 minutes and holding, 15 minute hold
-
#141
by
Ronsmytheiii
on 25 May, 2010 02:56
-
payload processing review
-
#142
by
Satori
on 25 May, 2010 02:57
-
Vehicle configuration for this mission...
-
#143
by
Satori
on 25 May, 2010 02:59
-
-
#144
by
Nick L.
on 25 May, 2010 03:01
-
-
#145
by
Ronsmytheiii
on 25 May, 2010 03:01
-
-
#146
by
Satori
on 25 May, 2010 03:01
-
-
#147
by
Nick L.
on 25 May, 2010 03:02
-
-
#148
by
Satori
on 25 May, 2010 03:03
-
Sat configuration inside payload fairing...
-
#149
by
Ronsmytheiii
on 25 May, 2010 03:03
-
-
#150
by
Chris Bergin
on 25 May, 2010 03:03
-
-
#151
by
Ronsmytheiii
on 25 May, 2010 03:03
-
performing launch conductor readiness poll
-
#152
by
Nick L.
on 25 May, 2010 03:04
-
Polling go.
-
#153
by
Nick L.
on 25 May, 2010 03:04
-
-
#154
by
Ronsmytheiii
on 25 May, 2010 03:05
-
lock pins pull of umbilical arms, master script running
-
#155
by
Satori
on 25 May, 2010 03:07
-
-
#156
by
Ronsmytheiii
on 25 May, 2010 03:07
-
S/C in internal power
-
#157
by
Nick L.
on 25 May, 2010 03:08
-
T-5 minutes and counting.
-
#158
by
Nick L.
on 25 May, 2010 03:08
-
-
#159
by
Ronsmytheiii
on 25 May, 2010 03:09
-
Launch Vehicle switching to internal power