#320
by
Ronsmytheiii
on 21 Apr, 2010 10:09
-
If i heard right, jacking will occur at 07:00
-
#321
by
DaveS
on 21 Apr, 2010 10:10
-
Ready to transfer CT from shore power to onboard power.
-
#322
by
Ronsmytheiii
on 21 Apr, 2010 10:15
-
water truck on stand by
-
#323
by
DaveS
on 21 Apr, 2010 10:15
-
HB1 doors are open for the rollout.
-
#324
by
Ronsmytheiii
on 21 Apr, 2010 10:17
-
8 hour weather : 10 knots wind , 30 % rain/10% lightning chance till noon
-
#325
by
Ronsmytheiii
on 21 Apr, 2010 10:27
-
Official update:
"STS-132 Mission: Storms have delayed the start of Atlantis' move to Launch Pad 39A. Rollout now is expected to start between 7:30 & 8a EDT"
http://twitter.com/NASAKennedy
-
#326
by
Ronsmytheiii
on 21 Apr, 2010 10:32
-
Complete on CT power transfer
-
#327
by
marshallsplace
on 21 Apr, 2010 10:37
-
-
#328
by
DaveS
on 21 Apr, 2010 10:52
-
Platforms have been verified clear for jacking.
-
#329
by
Ronsmytheiii
on 21 Apr, 2010 10:53
-
Don't see any constraints to jacking, final press on to jacking
-
#330
by
Ronsmytheiii
on 21 Apr, 2010 10:56
-
performing walk down, starting jacking after 7:00
-
#331
by
Ronsmytheiii
on 21 Apr, 2010 11:00
-
Left/Right RCS TVC verification underway
-
#332
by
Ronsmytheiii
on 21 Apr, 2010 11:01
-
Performing comm checks
-
#333
by
Ronsmytheiii
on 21 Apr, 2010 11:12
-
Weather, not a lot of sunshine but only about a 20% chance of rain, rain will not be heavy.
-
#334
by
Mindcrash
on 21 Apr, 2010 11:13
-
Will it be covered on NASA TV?
-
#335
by
Ronsmytheiii
on 21 Apr, 2010 11:14
-
Crawlerway still not dry enough, right now recommending to stand down, try again tonight
-
#336
by
Ronsmytheiii
on 21 Apr, 2010 11:20
-
Earliest motion would be 13 hours after CT shutdown, still a lot of muck on crawlerway, with lack of sun 8 hours to dry
-
#337
by
Chris Bergin
on 21 Apr, 2010 11:36
-
Have a rollout article ready to go, but will hold it until tonight's latest attempt - and will beef it up with manifest meeting notes.
We'll check contingency in the flow for May 14, as it's getting tight on the pad flow requirements.
-
#338
by
Chris Bergin
on 21 Apr, 2010 11:56
-
Delayed to 00:01 Thursday is the official word.
-
#339
by
Chris Bergin
on 21 Apr, 2010 12:02
-
Down to about one day of contingency in the flow to make May 14.