-
#280
by
Chris Bergin
on 21 Nov, 2009 18:40
-
They've got what they need with that connector.
5hrs 7mins in.
-
#281
by
robertross
on 21 Nov, 2009 18:40
-
5hrs 7 min into the spacewalk.
All the work on SGANT taking place in the 'rats nest'.
-
#282
by
Retired Downrange
on 21 Nov, 2009 18:40
-
The ISS "rats nest"
-
#283
by
arkaska
on 21 Nov, 2009 18:41
-
MCC just confirmed that Mike had the camera to close to the connector for it to focus.
-
#284
by
robertross
on 21 Nov, 2009 18:44
-
Mike has a go to remate the connectors
-
#285
by
robertross
on 21 Nov, 2009 18:45
-
Mike translating to PMA1 to get the APFR
-
#286
by
Chris Bergin
on 21 Nov, 2009 18:45
-
Mike translating to PMA-1 to grab the APFR
-
#287
by
Chris Bergin
on 21 Nov, 2009 18:46
-
5hrs 14 minutes into EVA-2.
-
#288
by
Chris Bergin
on 21 Nov, 2009 18:49
-
-
#289
by
Chris Bergin
on 21 Nov, 2009 18:49
-
Atlantis in view.
NSF Primary coverage handover at NSF MCC to Arkaska - as I'm hungry
-
#290
by
arkaska
on 21 Nov, 2009 18:50
-
-
#291
by
Retired Downrange
on 21 Nov, 2009 18:50
-
I wonder if the plan is to leave some of the U.S. EMU space suits on the ISS when the Shuttle retires?
-
#292
by
arkaska
on 21 Nov, 2009 18:51
-
I wonder if the plan is to leave some of the U.S. EMU space suits on the ISS when the Shuttle retires?
Yes the station always has 3 EMUs onboard
-
#293
by
arkaska
on 21 Nov, 2009 18:51
-
Randy is just hanging out watching the shuttle
He is starting to remove the APFR
-
#294
by
robertross
on 21 Nov, 2009 18:52
-
Oops, Mike didn't connect the RET to the APFR, but to the WIF...good catch by MCC.
-
#295
by
arkaska
on 21 Nov, 2009 18:55
-
-
#296
by
robertross
on 21 Nov, 2009 18:59
-
Safety tether snag
-
#297
by
arkaska
on 21 Nov, 2009 19:00
-
We can see Mike to the right of the A/L
-
#298
by
robertross
on 21 Nov, 2009 19:02
-
Randy working on a tool stantion
-
#299
by
arkaska
on 21 Nov, 2009 19:02
-
The tool stanchion is pointing the wrong way so Randy has to fix that.
Mike is waiting for some help by Randy with his snagged tether.