-
#240
by
Retired Downrange
on 21 Nov, 2009 18:03
-
an hour and a half left!!!... more get aheads???
-
#241
by
Chris Bergin
on 21 Nov, 2009 18:04
-
Get-ahead potentials: ATA bolt. APFR 5 tool stantion relocate.
MCC-H suggest taking a look at the SGANT connection that was part of EVA-1, as they are having issues with that.
Less than 90 mins to go.
-
#242
by
MikeMi.
on 21 Nov, 2009 18:04
-
No this is the last one they are working on now. There are 2 more UCCAS but there is no need to deploy them since no more ELCs are planned.
O gosh, u are right. Got mess in mind..
Anyway they are doing amazing job today.
-
#243
by
Retired Downrange
on 21 Nov, 2009 18:06
-
Mike... The PAS king!
-
#244
by
Chris Bergin
on 21 Nov, 2009 18:06
-
Both are feeling ok to keep pushing.
"I've got a bit left in the tank."
"I've got some more quarters to put into Atlantis. I will wrestle with the monster!" - No idea what that was about, but they are obviously good to continue

"You can put Mike Foreman of the US Navy down for three PAS' in two EVAs."
-
#245
by
Chris Bergin
on 21 Nov, 2009 18:08
-
Ready to latch indicators are next for this PAS. SCANT is next up.
-
#246
by
robertross
on 21 Nov, 2009 18:09
-
Both are feeling ok to keep pushing.
"I've got a bit left in the tank."
"I've got some more quarters to put into Atlantis. I will wrestle with the monster!" - No idea what that was about, but they are obviously good to continue 
Liked that comment too.
I think the 'monster' is the ATA bolt.
-
#247
by
Chris Bergin
on 21 Nov, 2009 18:10
-
Glove check and tool inventory checks.
Gloves in good condition.
-
#248
by
Analyst
on 21 Nov, 2009 18:14
-
No this is the last one they are working on now. There are 2 more UCCAS but there is no need to deploy them since no more ELCs are planned.
No, there are no more UCCAS's. There are only two (and not four) UCCAS's on P3, and both are occupied. Late next year there will be 1 ESP, 4 ELC's and AMS, using up all available sites.
Analyst
Analyst
-
#249
by
robertross
on 21 Nov, 2009 18:14
-
MCCC: consumables are great.
Want Mike to do SGANT.
Randy for APFR5.
-
#250
by
arkaska
on 21 Nov, 2009 18:15
-
No this is the last one they are working on now. There are 2 more UCCAS but there is no need to deploy them since no more ELCs are planned.
No, there are no more UCCAS's. There are only two (and not four) UCCAS's on P3, and both are occupied. Late next year there will be 1 ESP, 4 ELC's and AMS, using up all available sites.
Analyst
Analyst
Hmm so where were ELC-5 supposed to go while it was on the manifest?
-
#251
by
Chris Bergin
on 21 Nov, 2009 18:15
-
Consumables are good for 8 hours.
Big plan:
APFR 5 for Randy.
SGANT for Mike.
-
#252
by
Chris Bergin
on 21 Nov, 2009 18:18
-
Asking Mike to take photos of the SGANT connector pins.
From the FRR:
-
#253
by
wjbarnett
on 21 Nov, 2009 18:19
-
Hmm so where were ELC-5 supposed to go while it was on the manifest?
AMS took its spot!
-
#254
by
MikeMi.
on 21 Nov, 2009 18:19
-
APFR 5 for Randy.
Interesting cause I thought relocation of APFR 3 was more important..
-
#255
by
Chris Bergin
on 21 Nov, 2009 18:19
-
-
#256
by
Analyst
on 21 Nov, 2009 18:21
-
Hmm so where were ELC-5 supposed to go while it was on the manifest?
I am not sure it ever was on the manifest. If it was, it was before AMS was on the manifest. So the answer is: The AMS place.
Analyst
PS: Are you guys sure they are going to the SGANT, because this is the big Ku-band dish and not the SASA (S-band) spare they put on Z1 during EVA-1.
-
#257
by
robertross
on 21 Nov, 2009 18:23
-
PS: Are you guys sure they are going to the SGANT, because this is the big Ku-band dish and not the SASA (S-band) spare they put on Z1 during EVA-1.
Well that was the call.
Yup, space-to-ground antenna connections was the call from PAO
-
#258
by
Chris Bergin
on 21 Nov, 2009 18:23
-
PS: Are you guys sure they are going to the SGANT, because this is the big Ku-band dish and not the SASA (S-band) spare they put on Z1 during EVA-1.
SGANT cable connector pins is what PAO said.
Back at the airlock.
-
#259
by
arkaska
on 21 Nov, 2009 18:23
-
They installed a SGANT cable after the SASA installation on EVA-1