Headed out to install APFR.
Payload bay to get ORU
-
#61
by
Ronsmytheiii
on 19 Nov, 2009 13:47
-
-
#62
by
Chris Bergin
on 19 Nov, 2009 13:48
-
Notably that radiator panel that's peeled/laminated away from the structure doesn't appear to have gotten any worse since first spotted.
-
#63
by
Ronsmytheiii
on 19 Nov, 2009 13:49
-
-
#64
by
Ronsmytheiii
on 19 Nov, 2009 13:51
-
Mike removing bolts on S-band ORU, Mike heading to SSRMS to install APFR
-
#65
by
robertross
on 19 Nov, 2009 13:54
-
Do they plan on fixing the delamination on the radiator panel in a future EVA?
More than likely the entire radiator will be replaced on a future mission.
As an add-on to this, it would only be the small vertical row that would be replaced, not just one panel, and not the whole array (as I too found out).
-
#66
by
Ronsmytheiii
on 19 Nov, 2009 13:55
-
-
#67
by
arkaska
on 19 Nov, 2009 13:56
-
Mike will now remove the 2 aft launch restraint bolts. Expecting 12 turns each.
-
#68
by
Retired Downrange
on 19 Nov, 2009 13:57
-
Preflight Interview: STS-129 interview with Mission Specialist Leland Melvin.
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/interview_melvin.htmlAnd then on EVA 1 and 2 we’re going to be doing the support for those EVAs with Mike and Bobby and then Comrade and Bobby, or Randy, we call him “Comrade.”
------------------------------------------------------
“Comrade”
Randolph "Randy" Bresnik is the IV spacewalk coordinator.
-
#69
by
Ronsmytheiii
on 19 Nov, 2009 13:57
-
-
#70
by
arkaska
on 19 Nov, 2009 13:59
-
Mike will now remove the ERAD he temporarily installed on SASA and he will return it to the TSA.
-
#71
by
Ronsmytheiii
on 19 Nov, 2009 14:00
-
-
#72
by
arkaska
on 19 Nov, 2009 14:01
-
Satcher is now ready to ingress the APFR after installing a safety tether on the SSRMS
-
#73
by
Ronsmytheiii
on 19 Nov, 2009 14:03
-
-
#74
by
arkaska
on 19 Nov, 2009 14:04
-
Satchers ride over to the payload bay on the SSRMS will take 30 minutes. During this time he can just enjoy the view.
Mike will continue removing SASA.
-
#75
by
Ronsmytheiii
on 19 Nov, 2009 14:07
-
WVS of Mike through S-band
-
#76
by
arkaska
on 19 Nov, 2009 14:08
-
Mike is removing 2 caps from the SASA and temp stow them.
Mike will be able to see Satcher on the SSRMS shortly.
-
#77
by
Ronsmytheiii
on 19 Nov, 2009 14:09
-
-
#78
by
arkaska
on 19 Nov, 2009 14:12
-
They must be between 20-30 minutes ahead of schedule.
-