-
#20
by
Ronsmytheiii
on 19 Nov, 2009 11:10
-
Mike is now in his torso and has his comm cap on
-
#21
by
Ronsmytheiii
on 19 Nov, 2009 11:14
-
Helping Mike don his left glove, same for Satcher
Now the right glove
-
#22
by
Ronsmytheiii
on 19 Nov, 2009 11:20
-
-
#23
by
Ronsmytheiii
on 19 Nov, 2009 11:22
-
Now working on Satcher's helmet.
Same for Mike, actuator to IV.
-
#24
by
Ronsmytheiii
on 19 Nov, 2009 11:28
-
-
#25
by
Ronsmytheiii
on 19 Nov, 2009 11:32
-
-
#26
by
Ronsmytheiii
on 19 Nov, 2009 11:41
-
-
#27
by
Ronsmytheiii
on 19 Nov, 2009 11:46
-
Go for airlock repress, up to 14 psi, a few minutes behind schedule
-
#28
by
Ronsmytheiii
on 19 Nov, 2009 11:56
-
Airlock hatch to Node 1 is open
-
#29
by
Ronsmytheiii
on 19 Nov, 2009 12:00
-
End suit pre-breathe
-
#30
by
elmarko
on 19 Nov, 2009 12:05
-
Anyone know where we are in a checklist at all? I have the 129 EVA checklist out but have completely lost track.
-
#31
by
Ronsmytheiii
on 19 Nov, 2009 12:08
-
Go to press into EMU pre-breathe
-
#32
by
Ronsmytheiii
on 19 Nov, 2009 12:15
-
Installing Mike's tool belt.
-
#33
by
Ronsmytheiii
on 19 Nov, 2009 12:23
-
Lost KU, might be awhile before it comes back
-
#34
by
Ronsmytheiii
on 19 Nov, 2009 12:44
-
Mike is headed into the Equipment lock.
-
#35
by
Ronsmytheiii
on 19 Nov, 2009 12:50
-
Equipment lock hatch has been closed
-
#36
by
John44
on 19 Nov, 2009 12:53
-
-
#37
by
Ronsmytheiii
on 19 Nov, 2009 12:55
-
EV-1 and EV-2 comm check in equipment lock, a bit hard to hear due to the ambient noise but I would guess they are opening the depress valve.
-
#38
by
Ronsmytheiii
on 19 Nov, 2009 13:05
-
Iso valve to closed, performing leak checks
Leak check complete, going to EVA
-
#39
by
Ronsmytheiii
on 19 Nov, 2009 13:07
-
Iso valve to open going down to 2.0 psi.