-
#160
by
arkaska
on 19 Nov, 2009 17:05
-
Satcher is done with the JEMRMS. He will now egress the SSRMS where he has been during the whole EVA and go ahead with some get-ahead tasks.
-
#161
by
arkaska
on 19 Nov, 2009 17:08
-
Mike is at the S0 adapter and will try to soft dock it.
Anyone who can post photos for a while?
-
#162
by
arkaska
on 19 Nov, 2009 17:17
-
Mike is trying to do the soft dock. Will go to the adapter they brought with them.
-
#163
by
arkaska
on 19 Nov, 2009 17:22
-
Mike has successfully connected the two cable by using the adapter brought up with STS-129.
-
#164
by
arkaska
on 19 Nov, 2009 17:24
-
Next up is get-ahead tasks, still waiting on decision on which tasks will be preformed.
-
#165
by
arkaska
on 19 Nov, 2009 17:28
-
Mike is still working on some clean-up of his last work site.
-
#166
by
arkaska
on 19 Nov, 2009 17:29
-
The get-ahead task will be deployment of a UCAS a task which will take closer to 1 hours 30 minutes.
-
#167
by
arkaska
on 19 Nov, 2009 17:33
-
When done with their clean-up they will both be heading back to the A/L before starting the UCAS deployment.
7-144 in the EVA checklist.
-
#168
by
psloss
on 19 Nov, 2009 17:33
-
The get-ahead task will be deployment of a UCAS a task which will take closer to 1 hours 30 minutes.
This is going to be a PAS deploy on S3.
-
#169
by
racshot65
on 19 Nov, 2009 17:34
-
Whats a UCAS guys ?
-
#170
by
arkaska
on 19 Nov, 2009 17:36
-
Whats a UCAS guys ?
It's going to be a PAS (payload attach system), thats where they mate the ELC to the station.
-
#171
by
arkaska
on 19 Nov, 2009 17:37
-
Recharge of O2 for Mike is going on in the A/L
-
#172
by
racshot65
on 19 Nov, 2009 17:37
-
Ahh right thank you
-
#173
by
arkaska
on 19 Nov, 2009 17:48
-
Gathering tools needed for the deployment.
-
#174
by
psloss
on 19 Nov, 2009 17:50
-
Whats a UCAS guys ?
It's going to be a PAS (payload attach system), thats where they mate the ELC to the station.
Actually, I believe ELC-1 was attached to a UCCAS (Unpressurized Cargo Carrier Attachment System) on P3. And ELC-2 will be attached to a different PAS (Payload Attachment System) on S3.
-
#175
by
arkaska
on 19 Nov, 2009 17:51
-
Whats a UCAS guys ?
It's going to be a PAS (payload attach system), thats where they mate the ELC to the station.
Actually, I believe ELC-1 was attached to a UCCAS (Unpressurized Cargo Carrier Attachment System) on P3. And ELC-2 will be attached to a different PAS (Payload Attachment System) on S3.
I thought UCCAS and PAS was basically the same thing with different names. Glad you correct me.
-
#176
by
arkaska
on 19 Nov, 2009 17:51
-
Inside the A/L gathering tools.
-
#177
by
robertross
on 19 Nov, 2009 17:52
-
Whats a UCAS guys ?
It's going to be a PAS (payload attach system), thats where they mate the ELC to the station.
Not sure if it's the inboard or outboard one, but here is a sketch of what it will look like.
-
#178
by
robertross
on 19 Nov, 2009 17:54
-
Here are the relevent EVA tasks related to PAS deploy
-
#179
by
arkaska
on 19 Nov, 2009 17:54
-