#140
by
Analyst
on 19 Nov, 2009 16:09
-
Way ahead of the timeline, about 90 minutes or more.
Analyst
-
#141
by
arkaska
on 19 Nov, 2009 16:10
-
Way ahead of the timeline, about 90 minutes or more.
Analyst
Around 90 for Satcher, probably more for Mike
-
#142
by
arkaska
on 19 Nov, 2009 16:12
-
2 hours ahead according to PAO.
Snares partially open on POA. When exercising the bearings Satcher is performing 40 cycles in 1 minute.
-
#143
by
Analyst
on 19 Nov, 2009 16:16
-
2 hours ahead according to PAO.
Snares partially open on POA.
So the PAO annouces the time and the POA has snares.

I kinda love this acronym world.
Analyst
-
#144
by
arkaska
on 19 Nov, 2009 16:17
-
Snares check out in progress in POA (opening and closing snares).
-
#145
by
arkaska
on 19 Nov, 2009 16:19
-
Mike has started with installing a LAN cable to FGB. At the moment he is working on it between Node-1 and Lab. Is supposed to take 45 minutes but with their pase it will probably take half that time.
-
#146
by
arkaska
on 19 Nov, 2009 16:21
-
Work is done with POA and Satcher is ready for the 10 minutes maneuver to JEM-RMS.
-
#147
by
arkaska
on 19 Nov, 2009 16:28
-
Satcher approaching JEMRMS. The procedure will be the same as with POA. Will start with some photographing.
SASA check out is ok.
-
#148
by
arkaska
on 19 Nov, 2009 16:30
-
Taking out the grease gun.
Get-ahead tasks discussion starting at MCC-H. Mike need to do a O2 recharge before and get-ahead tasks.
-
#149
by
arkaska
on 19 Nov, 2009 16:34
-
Mike working on the LAN cable.
-
#150
by
robertross
on 19 Nov, 2009 16:38
-
Satcher approaching JEMRMS. The procedure will be the same as with POA. Will start with some photographing.
SASA check out is ok.
Here's a PDF page from the EVA checklist on the SASA...
-
#151
by
arkaska
on 19 Nov, 2009 16:42
-
We don't have ISS-ku so here is a photo from the shuttle payload bay.
-
#152
by
robertross
on 19 Nov, 2009 16:43
-
Hope I don't get into too much trouble for this...
here's the relevent pages on the JEM lube & checkout
-
#153
by
arkaska
on 19 Nov, 2009 16:45
-
Satcher is done with the greasing and will start with exercising the bearings.
-
#154
by
arkaska
on 19 Nov, 2009 16:50
-
Mike is finishing his last wire tire and is now working on clean-up of the work site.
-
#155
by
arkaska
on 19 Nov, 2009 16:56
-
Snare check-out on JEMRMS.
-
#156
by
arkaska
on 19 Nov, 2009 16:58
-
Mike getting ready to head over to S0. There he will try to connect the connection they had problem with during STS-128.
-
#157
by
John44
on 19 Nov, 2009 17:01
-
-
#158
by
arkaska
on 19 Nov, 2009 17:03
-
-
#159
by
robertross
on 19 Nov, 2009 17:03
-
Here's the relevent pages concerning the S0 connector