#120
by
arkaska
on 19 Nov, 2009 15:24
-
Mike will now install a cable between Z1 and the Rats Nest (between S0 and Lab) and wire tire it down to hand rails along the way.
-
#121
by
arkaska
on 19 Nov, 2009 15:27
-
The POA lube Satcher will preform should take about 1 hour and 15 minutes including setup and cleanup of work site.
-
#122
by
Ronsmytheiii
on 19 Nov, 2009 15:27
-
arkasa I need to head out, can you do pictures too?
-
#123
by
jarthur
on 19 Nov, 2009 15:27
-
I am only able to find sts-128 flight data files on NASA's site. Has anyone seen the EVA checklist for this mission?
-
#124
by
arkaska
on 19 Nov, 2009 15:28
-
arkasa I need to head out, can you do pictures too?
I'll do pictures as well.
-
#125
by
arkaska
on 19 Nov, 2009 15:29
-
Satcher is taking photos of himself.
-
#126
by
Analyst
on 19 Nov, 2009 15:30
-
I am only able to find sts-128 flight data files on NASA's site. Has anyone seen the EVA checklist for this mission?
L2 only, so far.
Are the SASA cables all connected?
Analyst
-
#127
by
arkaska
on 19 Nov, 2009 15:31
-
MCC-H will now power down some system so Mike can connect the cable in the Rats Nest.
-
#128
by
arkaska
on 19 Nov, 2009 15:32
-
I am only able to find sts-128 flight data files on NASA's site. Has anyone seen the EVA checklist for this mission?
L2 only, so far.
Are the SASA cables all connected?
Analyst
The first two was connected. I think the cable Mike is working on now is for SASA as well. MCC-H got the go for power-up of SASA a while ago.
-
#129
by
arkaska
on 19 Nov, 2009 15:34
-
It sure looks like a Rats Nest.
-
#130
by
arkaska
on 19 Nov, 2009 15:35
-
Satcher on the end of SSRMS with the newly installed ELC-1 in the background.
-
#131
by
arkaska
on 19 Nov, 2009 15:35
-
Satcher has arrived at POA and is now taking photos of the bearings.
-
#132
by
arkaska
on 19 Nov, 2009 15:42
-
Only S-band coverage at the moment. Mike is still working with the cable at the moment he is tying it down along the handrails, 2 done and 2 to go.
-
#133
by
arkaska
on 19 Nov, 2009 15:46
-
2 hours and 19 minutes into todays spacewalk (The SASA installation was planned to take 2 hours 45 minutes).
Mike is having some problems with missing wire tires on one handrail, will move on to next one instead.
-
#134
by
arkaska
on 19 Nov, 2009 15:51
-
Satcher as awfully quiet I guess he is off playing with his grease gun.
-
#135
by
arkaska
on 19 Nov, 2009 15:54
-
Mike is done with the cable and next up is the change out of a Node-1 handrail. The new hand rail have lines in it for NH3. Task is expected to take 40 minutes.
He is translation to the A/L to retrieve the Node-1 crew lock bag the brought with them out of the A/L earlier.
-
#136
by
arkaska
on 19 Nov, 2009 15:55
-
Satcher has finished putting grease on all bearings of POA and will now exercise the bearings.
-
#137
by
arkaska
on 19 Nov, 2009 15:58
-
Mike is now at Node-1 and will temp-stow the bag he just picked up.
-
#138
by
arkaska
on 19 Nov, 2009 16:02
-
Mike will now release the 2 bolts holding the hand rail in place, 8 turns each.
Will retrieve the NH3 HR from crew lock bag.
-
#139
by
arkaska
on 19 Nov, 2009 16:07
-
Satcher with the POA with fully closed snares.
Mike is driving the bolts to hold the new HR in place.