-
#220
by
chksix
on 18 Nov, 2009 16:36
-
Nicole signing crew photos
-
#221
by
Ronsmytheiii
on 18 Nov, 2009 16:38
-
Performing leak check on vestibule
-
#222
by
Ronsmytheiii
on 18 Nov, 2009 16:52
-
10 minutes left in leak check
-
#223
by
Ronsmytheiii
on 18 Nov, 2009 16:59
-
Placing protective covers on the flightdeck windows
(40!!)
-
#224
by
Lawntonlookirs
on 18 Nov, 2009 17:02
-
It appears that they are giving more coverage of activities inside the orbiter this time.
-
#225
by
Ronsmytheiii
on 18 Nov, 2009 17:03
-
leak check complete, go to open APAS hatch
-
#226
by
Ronsmytheiii
on 18 Nov, 2009 17:07
-
station now has attitude control
-
#227
by
NavySpaceFan
on 18 Nov, 2009 17:07
-
What's the meaning behind the "40!!!!" exclamation a while ago?
-
#228
by
arkaska
on 18 Nov, 2009 17:17
-
Both hatches on PMA-2 is open, the remaining hatch is the shuttle hatch.
-
#229
by
arkaska
on 18 Nov, 2009 17:20
-
An empty flight deck since everybody is down at the hatch.
-
#230
by
arkaska
on 18 Nov, 2009 17:22
-
Orbit-2 team is taking over from the Orbit-1 team at MCC-H.
-
#231
by
arkaska
on 18 Nov, 2009 17:24
-
The Mission Status Briefing will be in about a hour at 2.30 ET
-
#232
by
Ronsmytheiii
on 18 Nov, 2009 17:26
-
giant duct staged in node 2 to supply air to ODS once opened
-
#233
by
Ronsmytheiii
on 18 Nov, 2009 17:30
-
well apparently I missed them entering
-
#234
by
NavySpaceFan
on 18 Nov, 2009 17:31
-
Well that was quick and quiet.
-
#235
by
Ronsmytheiii
on 18 Nov, 2009 17:32
-
-
#236
by
arkaska
on 18 Nov, 2009 17:33
-
PAO sad earlier that he would say when hatch opening accrued if not captured on video guess that didn't happen.
-
#237
by
arkaska
on 18 Nov, 2009 17:34
-
Shuttle crew is going through their safety briefing.
(Now PAO mentions the time of hatch opening)
-
#238
by
arkaska
on 18 Nov, 2009 17:35
-
-
#239
by
Ronsmytheiii
on 18 Nov, 2009 17:36
-
now playing entry:
note only 12 people on station, not 13