#20
by
Chris Bergin
on 23 May, 2009 09:33
-
Port closed.
OPS2 to OPS3 is go via polling.
-
#21
by
shaula1247
on 23 May, 2009 09:33
-
Port door closed, starboard door in work.
FD polling for transfer to ops 3
-
#22
by
Chris Bergin
on 23 May, 2009 09:34
-
Steve Lindsey checking weather to the south in the T-38.
-
#23
by
shaula1247
on 23 May, 2009 09:35
-
Steve Lindsay flying to south and east checking approaching weather.
-
#24
by
shaula1247
on 23 May, 2009 09:35
-
Nominal PLBD closing. Go for ops 3 transition.
-
#25
by
shaula1247
on 23 May, 2009 09:38
-
-
#26
by
shaula1247
on 23 May, 2009 09:50
-
MCC: "Unless you need em, take the forward payload bay floods to off"
Atlantis: " We're showing those as off"
Minor stuff but an interesting exchange, MCC had no direct data but was inferring lights were on from other indications.
-
#27
by
shaula1247
on 23 May, 2009 09:52
-
Look at that, a small transfer down the rbar and they are home. Pity about all that energy and orbital mechanics stuff.
-
#28
by
shaula1247
on 23 May, 2009 09:56
-
Atlantis is now moving to ops 3. (04:56 CDT approx)
-
#29
by
shaula1247
on 23 May, 2009 10:01
-
Atlantis: "Here comes ops 301 to expand the set."
MCC: "We are ready."
-
#30
by
shaula1247
on 23 May, 2009 10:05
-
Atlantis: Standing by for targets and state vector uplink.
MCC: State vector not required, targets ready to upload.
-
#31
by
shaula1247
on 23 May, 2009 10:06
-
Atlantis is go to suit up and press ahead to fluid loading. Next check is before start of fluid loading.
Weather is dynamic and is still on the border.
-
#32
by
shaula1247
on 23 May, 2009 10:08
-
Deorbit burn for first opportunity is 1:55 from now.
-
#33
by
shaula1247
on 23 May, 2009 10:15
-
Blocks 13, 14 and 16 complete, block 15 in work.
I'm not following the detailed checklist but I trust that means something to those who are.
-
#34
by
shaula1247
on 23 May, 2009 10:23
-
Steve Lindsey taxiing out in the STA to check local conditions.
-
#35
by
shaula1247
on 23 May, 2009 10:28
-
Atlantis crew going through suiting up and switch verification tasks.
-
#36
by
DaveS
on 23 May, 2009 10:30
-
-
#37
by
shaula1247
on 23 May, 2009 10:32
-
Atlantis has go through nominal deorbit prep through IMU align up to fluid loading. Seems an elaboration on previous clearances.
PAD is ready and waiting on Scooter to finish getting into his suit before it is copied up.
-
#38
by
shaula1247
on 23 May, 2009 10:39
-
Switch list verifications complete. Ready to copy PAD.
-
#39
by
shaula1247
on 23 May, 2009 10:46
-
PAD's copied up and verified. Burn would be 2:32 in duration.