#240
by
generic_handle_42
on 18 May, 2009 17:33
-
"Rollin', rollin', rollin'! Everybody sing along!"
-
#241
by
bish48
on 18 May, 2009 17:33
-
NOBL 7 showing as 20 mins task but seems way simpler than the other 2, no removal of existing layer no radiator to cover and stick down.
Singing Rawhide up there now, don't give up the day job (but who would?)
-
#242
by
rocketguy101
on 18 May, 2009 17:34
-
"Rollin, Rollin, Rollin!!!" I think he's dating himself there.
heh, I was humming that to myself!
-
#243
by
Chris Bergin
on 18 May, 2009 17:34
-
Getting out the roller.
"Rolling, rolling, rolling. Come on everybody.."

Great work Nick. Finalizing the article and will be back with you all shortly.
-
#244
by
generic_handle_42
on 18 May, 2009 17:34
-
Nice view of the spacewalkers.
-
#245
by
bish48
on 18 May, 2009 17:34
-
Go for 7
-
#246
by
NavySpaceFan
on 18 May, 2009 17:35
-
Go for NOBL 7!
-
#247
by
bish48
on 18 May, 2009 17:35
-
BAY 7 NOBL RETRIEVAL & INSTALLATION (00:20)
1. Mnvr to MINC
2. Boot plate and MFR stanchion as req’d
3. Receive NOBL 7 from FF EV
4. Mnvr to Bay 7
5. Install Bay 7 NOBL and integral vent plugs (4)
6. Connect NOBL ground cap on J-hook bolt
7. Very high five!!
-
#248
by
robertross
on 18 May, 2009 17:35
-
Going for NOBL 7...awesome!!
-
#249
by
generic_handle_42
on 18 May, 2009 17:36
-
2 of 3 (highest priority) NOBLs are installed. EVA will be extended to install NOBL 7 as well.
-
#250
by
generic_handle_42
on 18 May, 2009 17:38
-
I love this shot from the RMS elbow cam. Looking at a small piece of material on the PLB seal.
-
#251
by
NavySpaceFan
on 18 May, 2009 17:38
-
Found a bit of latex glove on the PLB seal, talking now.
-
#252
by
generic_handle_42
on 18 May, 2009 17:40
-
MCC discussing whether to remove the material. Concern would be prevention of the PLBD from sealing upon closure.
Removing the last NOBL from the MULE.
-
#253
by
bish48
on 18 May, 2009 17:40
-
Looks like they found what they say looks like a piece of latex glove on the payload bay sill. No plan to retrieve it.
-
#254
by
generic_handle_42
on 18 May, 2009 17:41
-
To be clear, I have circled the material in question.
-
#255
by
generic_handle_42
on 18 May, 2009 17:41
-
Translating to Bay 7 with the NOBL now.
-
#256
by
bish48
on 18 May, 2009 17:42
-
Final panel is being moved into position.
-
#257
by
generic_handle_42
on 18 May, 2009 17:43
-
I'm loving these shots from the RMS elbow!
-
#258
by
generic_handle_42
on 18 May, 2009 17:44
-
Working on the bottom of the NOBL now.
-
#259
by
bish48
on 18 May, 2009 17:45
-
last vent plug being installed now
just the ground cap on the J-Hook to go