-
#60
by
Kel
on 16 May, 2009 14:11
-
-
#61
by
Kel
on 16 May, 2009 14:12
-
-
#62
by
Kel
on 16 May, 2009 14:13
-
-
#63
by
Kel
on 16 May, 2009 14:15
-
-
#64
by
robertross
on 16 May, 2009 14:16
-
Doors are opening.
-
#65
by
Kel
on 16 May, 2009 14:17
-
Aft shroud doors open
"Hello Hubble"
-
#66
by
Kel
on 16 May, 2009 14:18
-
Done with 7-69
Ready for COSTAR removal
-
#67
by
Kel
on 16 May, 2009 14:19
-
Moving Y harness for COSTAR
-
#68
by
Kel
on 16 May, 2009 14:22
-
Decided not to use special tool to restrain Y harness - not needed
-
#69
by
robertross
on 16 May, 2009 14:22
-
Y harness not required. Putting it back in the box for return to ground. Lots of play in the harness already.
-
#70
by
Kel
on 16 May, 2009 14:23
-
All 4 connectors demated
-
#71
by
robertross
on 16 May, 2009 14:23
-
Moving into the telescope now. 3 feet.
-
#72
by
robertross
on 16 May, 2009 14:24
-
P4 demated.
P1 demated.
P2 demated.
-
#73
by
Kel
on 16 May, 2009 14:27
-
Disconnecting ground strap from COSTAR.
Atlantis over the Gulf of Mexico heading toward Miami
-
#74
by
MikeMi.
on 16 May, 2009 14:28
-
Cooperaton on high level

Now is time for grounding strap.
-
#75
by
Kel
on 16 May, 2009 14:30
-
John - Getting ready for A latch
-
#76
by
robertross
on 16 May, 2009 14:30
-
"The ground strap is thicker than the clip"
"You're kidding"
Doesn't sound to be an issue.
-
#77
by
Kel
on 16 May, 2009 14:31
-
-
#78
by
Kel
on 16 May, 2009 14:33
-
Going for B latch cover
-
#79
by
Kel
on 16 May, 2009 14:34
-
Both working together on A latch
Elapsed time almost 1 hour