#360
by
kneecaps
on 16 May, 2009 18:34
-
page 7-143 step 8 of John's column.
-
#361
by
Chris Bergin
on 16 May, 2009 18:35
-
Anchor drive in work. Out of Ku
-
#362
by
karizma23
on 16 May, 2009 18:35
-
Bummer of a time to lose video...
-
#363
by
MikeMi.
on 16 May, 2009 18:35
-
I have a weirdo question - Bueno is nickname of John? 
"Bueno" is Mike Good's nickname. Good=Bueno.
Ahh Ya.. seems to be so clear. Imho I dont know Spanish - pardon for that!

Glad to see/hear that today we are outta bigger problems.
-
#364
by
Chris Bergin
on 16 May, 2009 18:38
-
Box with the cards are installed.
-
#365
by
Kel
on 16 May, 2009 18:38
-
EVA elapsed time a little more than 5 hours
-
#366
by
kneecaps
on 16 May, 2009 18:38
-
All card drives (4) done and verified good.
-
#367
by
Kel
on 16 May, 2009 18:42
-
-
#368
by
Kel
on 16 May, 2009 18:43
-
P11 re-installed (did I hear that correctly)?
-
#369
by
Kel
on 16 May, 2009 18:45
-
Should get video in about 10 min
-
#370
by
Chris Bergin
on 16 May, 2009 18:50
-
-
#371
by
karizma23
on 16 May, 2009 18:50
-
Wow the MCC camera moved! And here I thought it never moved LOL.
-
#372
by
Kel
on 16 May, 2009 18:52
-
John getting ready to install PIE
PIE cable next
-
#373
by
Chris Bergin
on 16 May, 2009 18:52
-
Power Input Element in work. Ku back.
-
#374
by
Kel
on 16 May, 2009 18:54
-
-
#375
by
Kel
on 16 May, 2009 18:55
-
-
#376
by
Retired Downrange
on 16 May, 2009 18:55
-
John getting ready to install PIE
I hope we have KU if he installs the PIE in the FACE
-
#377
by
Kel
on 16 May, 2009 18:55
-
P6 mated to J6
-
#378
by
kneecaps
on 16 May, 2009 18:56
-
Very quick work installing the LVPS-R. Proceeding well with the final steps before cleanup.
-
#379
by
Kel
on 16 May, 2009 18:57
-
P8 mated to J8.
All connectors mated