#20
by
dickgold
on 16 May, 2009 12:38
-
About how long should it take to take out a screw on the
ACS and STIS?
-
#21
by
Kel
on 16 May, 2009 12:43
-
-
#22
by
GoForTLI
on 16 May, 2009 12:46
-
HST rotation to -V2 side forward underway.
-
#23
by
Kel
on 16 May, 2009 12:50
-
Interesting reflection in the first image.
Rotation...
-
#24
by
robertross
on 16 May, 2009 12:53
-
Hubble has now been rotated into position. Right on time.
-
#25
by
Kel
on 16 May, 2009 12:57
-
Hubble has now been rotated into position. Right on time.
-
#26
by
Kel
on 16 May, 2009 13:02
-
13 minutes of prebreathe to go before depress
-
#27
by
GoForTLI
on 16 May, 2009 13:17
-
GO for depress. About to close the inner hatch.
-
#28
by
psloss
on 16 May, 2009 13:22
-
Depress started.
-
#29
by
Kel
on 16 May, 2009 13:23
-
down to 8 psi
Currently over Somalia
-
#30
by
Kel
on 16 May, 2009 13:23
-
7 psi
Will stop at 5 psi to do suit checks before continuing to zero
-
#31
by
Kel
on 16 May, 2009 13:25
-
Airlock depress valve closed - suit checks in work
-
#32
by
Kel
on 16 May, 2009 13:26
-
EV2 leak check complete
-
#33
by
Kel
on 16 May, 2009 13:28
-
Robotic arm in motion to be ready for egress.
Lost KU
-
#34
by
Kel
on 16 May, 2009 13:29
-
Suit checks complete
Depress continuing down to zero
-
#35
by
Kel
on 16 May, 2009 13:30
-
4 psi
KU expected back in 10 min
-
#36
by
Kel
on 16 May, 2009 13:34
-
go to open and stow hatch
-
#37
by
Kel
on 16 May, 2009 13:35
-
outer hatch open
robotic arm in position
tether checks
-
#38
by
Kel
on 16 May, 2009 13:36
-
PET start 19:33
-
#39
by
AnalogMan
on 16 May, 2009 13:40
-
Official start of EVA logged at:
08:35 CDT
13:35 GMT
(and 19:33 MET as noted by Kel)