#160
by
robertross
on 16 May, 2009 15:52
-
Coming out of the telescope.
Both latches fully engaged.
COS permanently installed.
Connectors next.
-
#161
by
Kel
on 16 May, 2009 15:53
-
B latch cover installed.
Working on ground strap.
-
#162
by
kneecaps
on 16 May, 2009 15:54
-
Ground strap attachment will be worked by John in a moment.
Followed by inspect and mate of the COS connectors as shown:
-
#163
by
robertross
on 16 May, 2009 15:56
-
"turn me to my left....my other left"...lol
-
#164
by
Kel
on 16 May, 2009 15:57
-
Ground strap done.
Ready for 4 connectors
-
#165
by
Kel
on 16 May, 2009 16:01
-
-
#166
by
robertross
on 16 May, 2009 16:02
-
P1 mated
-
#167
by
Kel
on 16 May, 2009 16:02
-
-
#168
by
robertross
on 16 May, 2009 16:02
-
P4 mated
-
#169
by
Kel
on 16 May, 2009 16:03
-
-
#170
by
robertross
on 16 May, 2009 16:03
-
P3 mated
-
#171
by
robertross
on 16 May, 2009 16:03
-
"congratulations"
-
#172
by
robertross
on 16 May, 2009 16:03
-
Aliveness tests in work on COS
-
#173
by
robertross
on 16 May, 2009 16:05
-
Ground wants to confirm if a handle is loose based on helmet cam images. Concern about a wing nut being loose that would cause this.
-
#174
by
robertross
on 16 May, 2009 16:05
-
Confirmed: handle good.
-
#175
by
robertross
on 16 May, 2009 16:08
-
John is go to pad the thermal blanket back into place.
No joy
Pressing on.
-
#176
by
Chris Bergin
on 16 May, 2009 16:09
-
Some serious hardware in there.
-
#177
by
Kel
on 16 May, 2009 16:10
-
-
#178
by
robertross
on 16 May, 2009 16:10
-
Ground strap installation is in work.
-
#179
by
robertross
on 16 May, 2009 16:13
-
Atlantis now tracking just over KSC