-
#60
by
Satori
on 15 May, 2009 13:09
-
-
#61
by
Chris Bergin
on 15 May, 2009 13:10
-
Thermal Cover on the airlock is closed.
-
#62
by
Satori
on 15 May, 2009 13:12
-
-
#63
by
Satori
on 15 May, 2009 13:13
-
-
#64
by
Chris Bergin
on 15 May, 2009 13:13
-
MFR installed.
Good taking some time for a quick adaptation of being on an EVA (given it's his first) - per Kyle.
-
#65
by
Chris Bergin
on 15 May, 2009 13:16
-
Good on the MFR. Megan translating him to the ORU:
-
#66
by
Satori
on 15 May, 2009 13:17
-
-
#67
by
Satori
on 15 May, 2009 13:18
-
-
#68
by
Satori
on 15 May, 2009 13:19
-
-
#69
by
Chris Bergin
on 15 May, 2009 13:19
-
Mass with the SOAP.
MCC-H calling Scooter over the FES. Notes of "it could have been an ice issue, but in a good config."
Problem with Pri A on the FES. Requesting FES Pri B to off. Heater duct select A/B.
Core flush possible post EVA, due to the signature of ice on Pri A - causing it to shut down.
(two loops overlapping, so if anyone catched more, add to the thread).
-
#70
by
Satori
on 15 May, 2009 13:20
-
-
#71
by
Satori
on 15 May, 2009 13:21
-
-
#72
by
Satori
on 15 May, 2009 13:23
-
-
#73
by
Chris Bergin
on 15 May, 2009 13:25
-
Call to watch out for lube on the bolts.
Doors to the Fixed Head star tracker about to be opened.
-
#74
by
Satori
on 15 May, 2009 13:25
-
-
#75
by
Satori
on 15 May, 2009 13:27
-
-
#76
by
Satori
on 15 May, 2009 13:28
-
-
#77
by
Chris Bergin
on 15 May, 2009 13:28
-
RSU changeout is go, after safing commands have been confirmed.
-
#78
by
Satori
on 15 May, 2009 13:28
-
-
#79
by
Chris Bergin
on 15 May, 2009 13:29
-
Out of Ku, heading into orbital night.