-
#280
by
AnalogMan
on 15 May, 2009 17:44
-
Will they still do the battery next?
PIE harness get-ahead install next while they have this bay open.
Its an electrical cable assembly (not sure what PIE stands for yet!)
EDIT: PAO PIE is Power Input Element
-
#281
by
Kel
on 15 May, 2009 17:45
-
Going to ACS connector panel
-
#282
by
psloss
on 15 May, 2009 17:46
-
Any chance they'll take the problem child inside to get a better look and possibly fix the bent guide or remove Story's old piece of bubblegum or whatever? Or would entering an unblessed, pressurized non clean room environment disqualify it?
I was wondering the same thing. Just to get a chance to see it without all of the EVA gear on might show something obvious.
The ground asked the crew where they wanted to put S/N 1007 (COPE or airlock), but I missed what they responded.
-
#283
by
stockman
on 15 May, 2009 17:48
-
no clue what I am looking at here..
-
#284
by
Kel
on 15 May, 2009 17:48
-
View from Mass helmet cam inside HST.
Currently demating and mating cables (sorry, I didn't catch which ones).
-
#285
by
starbird
on 15 May, 2009 17:52
-
He's trying to connect the cable to ACS J1. Having some trouble since he has nothing to hold on to, and can't get any leverage to mate the connectors.
-
#286
by
Kel
on 15 May, 2009 17:53
-
Mass is having a little trouble connecting cables. When he pushes on the connector, he is pushing his own body rather than getting the cables connected.
-
#287
by
Kel
on 15 May, 2009 17:54
-
-
#288
by
Kel
on 15 May, 2009 17:55
-
PIE harness install complete.
Coming out of HST again.
-
#289
by
stockman
on 15 May, 2009 17:56
-
-
#290
by
stockman
on 15 May, 2009 17:57
-
back out - nice reflection
-
#291
by
Kel
on 15 May, 2009 17:59
-
Closing shroud doors.
One and a half hours behind.
Going to battery replacement task.
-
#292
by
stockman
on 15 May, 2009 18:00
-
-
#293
by
Chris Bergin
on 15 May, 2009 18:00
-
Next up:
Bay 2 Battery R&R: EV3 retrieves the new Bay 2 Battery from the SLIC. On MCCGo,
EV4, at the Bay 2 location, removes the old battery. The two EV crew swap
batteries. EV4 installs the new battery, while EV3 translates over to the SLIC to stow
the old battery on the SLIC for return. The ground will perform an aliveness test
followed by a functional test.
-
#294
by
stockman
on 15 May, 2009 18:01
-
Next up:
Bay 2 Battery R&R: EV3 retrieves the new Bay 2 Battery from the SLIC. On MCCGo,
EV4, at the Bay 2 location, removes the old battery. The two EV crew swap
batteries. EV4 installs the new battery, while EV3 translates over to the SLIC to stow
the old battery on the SLIC for return. The ground will perform an aliveness test
followed by a functional test.
to be followed by powdering and diapering I presume...

(must read back in the thread to get this one)..
-
#295
by
stockman
on 15 May, 2009 18:04
-
-
#296
by
stockman
on 15 May, 2009 18:04
-
were you born in a barn??? close the door...
-
#297
by
DaveS
on 15 May, 2009 18:05
-
Closing D3 shroud doors.
One and a half hours behind.
Going to battery replacement task.
It is -V3. +V3 is on the opposite side of the Aft Shroud. -V2/+V2 are on the axial sides of the Aft Shroud.
-
#298
by
stockman
on 15 May, 2009 18:06
-
-
#299
by
stockman
on 15 May, 2009 18:07
-