-
#380
by
Chris Bergin
on 14 May, 2009 19:54
-
Excellent work with the coverage Ron, superb.
-
#381
by
Chris Bergin
on 14 May, 2009 19:55
-
Is there scheduled a briefing today? Would like to hear about this mess with latchers from headmasters 
There is a mission status briefing after each EVA. Since the EVA is running long, the briefing will start 30 to 60 minutes after the EVA ends.
They might do a joint MSB/Post MMT too, as it's heading to that timeframe.
-
#382
by
Chris Bergin
on 14 May, 2009 19:58
-
"Ready for a hot shower and a good meal"
John in the airlock
-
#383
by
stockman
on 14 May, 2009 19:58
-
now getting inside the airlock
-
#384
by
stockman
on 14 May, 2009 20:02
-
Working away in the airlock
-
#385
by
Chris Bergin
on 14 May, 2009 20:02
-
Nice and cozy in the orbiter airlock!
Water off. Two minute timer on - thermal cover on, then close the hatch.
-
#386
by
Chris Bergin
on 14 May, 2009 20:05
-
Hatch closed and locked.
-
#387
by
MarsMethanogen
on 14 May, 2009 20:07
-
What's the two minutes for?
-
#388
by
Chris Bergin
on 14 May, 2009 20:07
-
Going on to internal power via the checklist.
-
#389
by
Chris Bergin
on 14 May, 2009 20:10
-
02 actuators to press.
John: "We gave Hubble a hug, but in traditional Hubble fashion, it threw us a couple of curves, but we have overcome them."
-
#390
by
Chris Bergin
on 14 May, 2009 20:14
-
7hrs 20 min EVA-1 (50 minutes over schedule).
-
#391
by
Chris Bergin
on 14 May, 2009 20:19
-
John now up to 44 hours 52 mins of EVA time - 8th in the rankings.
-
#392
by
Chris Bergin
on 14 May, 2009 20:20
-
MSB 4:15pm Central, 10:15pm UK (If there be an MMT after that, or combined, isn't noted).
-
#393
by
LostInSpace
on 14 May, 2009 20:20
-
What's the two minutes for?
Allows the ice block to sublimate from the suit system completely before repressing the airlock. Residual water on these plates will freeze too quickly during the next EVA and warp the plates.
-
#394
by
Chris Bergin
on 14 May, 2009 20:24
-
Orbit 1 at MCC-H praising the EVAers, "despite the wrinkles", and wish them the best for tomorrow.
Scooter: "I think it was a team effort today. We look forward to doing it again tomorrow."
Handover to Orbit 2.
-
#395
by
Chris Bergin
on 14 May, 2009 20:27
-
-
#396
by
stockman
on 14 May, 2009 20:33
-
1 down.... 4 to go.... good coverage today...
-
#397
by
stockman
on 14 May, 2009 20:39
-
-
#398
by
Chris Bergin
on 14 May, 2009 20:39
-
40 tiles now classed as missing from the FD2 inspections. Should still take just an hour in the same sweep.
-
#399
by
robertross
on 14 May, 2009 20:39
-
Oh... the call came that they have to do inspection of 40 tiles...but they can still do it in one sweep. They will simply adjust the zoom on the camera.