#180
by
Ford Mustang
on 14 May, 2009 15:09
-
Sunset and into nightfall.
-
#181
by
Ronsmytheiii
on 14 May, 2009 15:10
-
-
#182
by
Ford Mustang
on 14 May, 2009 15:10
-
Attaching handrails to WFPC/3. All going smooth so far.
-
#183
by
Ronsmytheiii
on 14 May, 2009 15:12
-
-
#184
by
Ronsmytheiii
on 14 May, 2009 15:13
-
-
#185
by
Ford Mustang
on 14 May, 2009 15:14
-
Vent valves on the WFPC/3 have been opened and it is vented. Drew is reconfiguring his pistol grip tool to disengage the ground strap bolt.
-
#186
by
Ronsmytheiii
on 14 May, 2009 15:15
-
Vent valves on the WFPC/3 have been opened and it is vented. Drew is reconfiguring his pistol grip tool to disengage the ground strap bolt.
-
#187
by
Ford Mustang
on 14 May, 2009 15:15
-
Ground strap bolt released, John has the strap. Giving PGT to John to hold while Drew readies for WFPC/3 release.
-
#188
by
Ford Mustang
on 14 May, 2009 15:16
-
Period of ratty COMM for 4 minutes. KU expected to be back within 15 minutes.
-
#189
by
Ford Mustang
on 14 May, 2009 15:17
-
Disengagement of the A-Latch went without incident. Should be 22.5 turns to fully disengage.
-
#190
by
Ford Mustang
on 14 May, 2009 15:18
-
10 turns in, all going smooth.
-
#191
by
Ford Mustang
on 14 May, 2009 15:19
-
22.5 turns done. All smooth.
-
#192
by
Ford Mustang
on 14 May, 2009 15:21
-
WFPC/3 is loose. Seems to still be engaged in the A-Latch, though. Houston agrees with a few more turns with the PGT to see if they can loosen it up.
-
#193
by
Ford Mustang
on 14 May, 2009 15:22
-
Four turns of the PGT on the A-Latch bolt and it's free!
-
#194
by
Ford Mustang
on 14 May, 2009 15:22
-
About 25 minutes behind schedule due to problems releasing the WFPC/2. Drew coming up out of the PLB with WFPC/3.
-
#195
by
Ford Mustang
on 14 May, 2009 15:25
-
FOD on the connector. Getting a real scientific plan to take it off, just gonna flick it!

Successful, did NOT touch the connector. Glove check is clean.
-
#196
by
Ford Mustang
on 14 May, 2009 15:26
-
Mirror looks "very clean" according to Drew. Going to start pitching WFPC/3 up and getting ready to install into Hubble. John going to check the canister to make sure things are clean before installing WFPC/2 into the SLIC.
-
#197
by
Ronsmytheiii
on 14 May, 2009 15:27
-
-
#198
by
bish48
on 14 May, 2009 15:28
-
I just realized I have a 15 second delay on my nasa tv feed as the postings here were actually ahead of what I was watching

Ron et al you are doing an awesome job. THANKS!!
-