#400
by
DaveS
on 09 May, 2009 12:00
-
T-27 hours and holding for 4 hours!
This hold will last for 4 hours during which the Blast Danger Area(BDA) will be cleared, the Power Reactant Distribution and Storage(PRSD) system will be prepared for the loading of the cryogenic reactants and the PRSD loading tankers will be placed and connected to the RSS OMBUU lines. Also during this hold, the SRB and Orbiter Pyrotechnic Initiator(PIC) controllers will be tested and checked out.
-
#401
by
rdale
on 09 May, 2009 13:48
-
NTV coverage (EDT):
May 9, Saturday
11 a.m. - STS-125 Countdown Status Briefing - KSC (Public and Media Channels)
NET 6:30 p.m. - STS-125 Prelaunch News Conference - KSC (All Channels)
May 10, Sunday
10 a.m. - STS-125 Countdown Status Briefing - KSC (Public and Media Channels)
12:30 p.m. - STS-125 Update Webcast - KSC (All Channels)
1 p.m. - Hubble Space Telescope Program Briefing - KSC (All Channels)
2 p.m. - Wide Field Planetary Camera Retrospective Briefing - KSC (All Channels)
5 p.m. - Launch Pad 39-A Rotating Service Structure Retraction - KSC (Public and Media Channels)
May 11, Monday
8:30 a.m. - STS-125 Launch Coverage and Commentary - KSC/JSC (All Channels)
2:01:49 p.m. - STS-125/Atlantis Launch - KSC/JSC (All Channels)
-
#402
by
ChrisGebhardt
on 09 May, 2009 14:15
-
If any one has a processing related question that they'd like answered during the press conference this morning or this afternoon PM me and we'll see about asking it.
-
#403
by
LostInSpace
on 09 May, 2009 14:35
-
You guys can probably answer this here instead of at the press conference however... there's an NSF post that the Delta IV GOES-O launch is no longer a range conflict. What will that do for 125's launch opportunities? What's the window? Is there still a planned 3 day attempt before recycle?
-
#404
by
jeff2space
on 09 May, 2009 14:41
-
You guys can probably answer this here instead of at the press conference however... there's an NSF post that the Delta IV GOES-O launch is no longer a range conflict. What will that do for 125's launch opportunities? What's the window? Is there still a planned 3 day attempt before recycle?
The range is still unavailable May 14-19, unrelated to GOES-O. It will be three attempts and then stand down until May 22.
-
#405
by
LostInSpace
on 09 May, 2009 14:48
-
Then what is the range conflict?
-
#406
by
jeff2space
on 09 May, 2009 14:56
-
Then what is the range conflict?
Military Operation
-
#407
by
ChrisGebhardt
on 09 May, 2009 14:58
-
Briefing participants in the room. Starting shortly = 1min
-
#408
by
ChrisGebhardt
on 09 May, 2009 15:01
-
NTD: Countdown going smoothly. No problems.
-
#409
by
ChrisGebhardt
on 09 May, 2009 15:02
-
Cryo reactant load starts around 1:30pm today.
-
#410
by
rdale
on 09 May, 2009 15:50
-
The range conflict question was asked, it was clarified again that it is not the GOES satellite but another customer -- that was all Jeff would say.
-
#411
by
John44
on 09 May, 2009 16:40
-
-
#412
by
Ronsmytheiii
on 09 May, 2009 18:14
-
-
#413
by
LostInSpace
on 09 May, 2009 18:33
-
The range conflict question was asked, it was clarified again that it is not the GOES satellite but another customer -- that was all Jeff would say.
Wondering if I should sleep on my balcony from the 14-19 in case something launches? ;-P
Thanks for asking!
-
#414
by
Chris Bergin
on 09 May, 2009 21:01
-
payload bay doors closed:
Which was not issue free. Didn't finish that operation until 10pm last night.
-
#415
by
usn_skwerl
on 09 May, 2009 21:17
-
when is RSS retract?
-
#416
by
Bubbinski
on 09 May, 2009 21:25
-
I believe it's 5 pm Eastern Sunday.
-
#417
by
bigboy_99
on 09 May, 2009 21:39
-
Via Twitter
"From the Mission Management Team meeting: mission operations, the spacewalk team, the crew and life sciences are all ready for launch."
"From the MMT: systems engineering and integration, flight ops and integration are not working any issues for launch."
-
#418
by
psloss
on 09 May, 2009 21:44
-
-
#419
by
ChrisGebhardt
on 09 May, 2009 21:49
-
Hearing the presser has tentatively been moved up to 6pm.