Author Topic: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1  (Read 67278 times)

Offline kneecaps

  • No Bucks, no Buck Rogers
  • Full Member
  • ****
  • Posts: 1622
  • Liked: 39
  • Likes Given: 17
Re: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1
« Reply #20 on: 03/19/2009 01:11 pm »
the TV schedule shows a "S6 PHOTOVOLTAIC RADIATOR DEPLOYMENT" at 03/23:00. they arent deploying the photovoltaic wings today, are they? NASA site claims that is on FD8. The conjunction of "photovoltaic" and "radiator"  words is confusing me. Heat radiators are not photovoltaic. and Solar arrays (photovoltaic) are not radiators. Or is this just a typo?

They are deploying the PV Radiators. The truss section has both the SAW (Solar Array Wings) AND two sets of retractable radiators...you can see them on the other truss sections.
« Last Edit: 03/19/2009 01:16 pm by kneecaps »
Allow subject to scream. In space no one will hear.

Offline Kel

  • Member
  • Full Member
  • ****
  • Posts: 1249
  • Minneapolis
  • Liked: 1
  • Likes Given: 0
Re: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1
« Reply #21 on: 03/19/2009 01:22 pm »
FD5 Execute package is available

http://www.nasa.gov/pdf/319787main_119_fd05_expck.pdf

On the first page, re: Bungee Exercise Contraints: I'm intrigued to learn what the "Good Morning Exercise" is, can anyone please explain?  :)

Good mornings are similar to stiff legged deadlifts (aka straight leg deadlifts) except the barbell is typically placed across the back of the shoulders. In this case, bungee cords attached to the bar would provide resistance rather than gravity.

http://www.exrx.net/WeightExercises/Hamstrings/BBGoodMorning.html
« Last Edit: 03/19/2009 01:29 pm by Kel »

Offline Chris Bergin

Head goes in here... ;)
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Hold at Step 33 in order to catch up with robotics. So may be a delay to EVA start.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

ISS now in attitude for pre-S6 installation.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

EVA-1 preview via the excellent SSP FRR Presnetations for STS-119 EVAs.

http://www.nasaspaceflight.com/2009/03/sts-119-eva-1-final-truss-segment-s6-installation/ - by Chris Gebhardt
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Hold at Step 33 in order to catch up with robotics. So may be a delay to EVA start.

"The stars are aligning" on the robotic timeline, so they are now good to press through to Step 60.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline generic_handle_42

  • Extreme Veteran
  • Full Member
  • ****
  • Posts: 1209
  • Toronto, Ontario
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1
« Reply #28 on: 03/19/2009 02:02 pm »
Swanson getting in his suit:
-Nick-

Offline Chris Bergin

EVA checklist in view. Robotics picking up - though no images.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

SSRMS is in motion.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline generic_handle_42

  • Extreme Veteran
  • Full Member
  • ****
  • Posts: 1209
  • Toronto, Ontario
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1
« Reply #31 on: 03/19/2009 02:04 pm »
Ask and you shall receive Chris!
-Nick-

Offline generic_handle_42

  • Extreme Veteran
  • Full Member
  • ****
  • Posts: 1209
  • Toronto, Ontario
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1
« Reply #32 on: 03/19/2009 02:13 pm »
Comfort gloves and wristlets going on:
« Last Edit: 03/19/2009 02:14 pm by generic_handle_42 »
-Nick-

Offline Chris Bergin

We could do with some more external shots, however!

EVA preps.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline generic_handle_42

  • Extreme Veteran
  • Full Member
  • ****
  • Posts: 1209
  • Toronto, Ontario
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1
« Reply #34 on: 03/19/2009 02:15 pm »
Donning EVA gloves.
« Last Edit: 03/19/2009 02:16 pm by generic_handle_42 »
-Nick-

Offline generic_handle_42

  • Extreme Veteran
  • Full Member
  • ****
  • Posts: 1209
  • Toronto, Ontario
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1
« Reply #35 on: 03/19/2009 02:18 pm »
A quick double-check that the gloves are locked
-Nick-

Offline Chris Bergin

Current position of SSRMS:
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Go to press past step 60 in EVA checklist, thanks to robotics timeline on schedule.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline generic_handle_42

  • Extreme Veteran
  • Full Member
  • ****
  • Posts: 1209
  • Toronto, Ontario
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-119 Flight Day 5 - S6 Installation and EVA 1
« Reply #38 on: 03/19/2009 02:22 pm »
Complex passing over the Middle East, about 8 minutes to orbital sunset.
-Nick-

Offline Chris Bergin

Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0