Author Topic: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting  (Read 60315 times)

Online eeergo

Ron getting the camera installed on the bracket.
-DaviD-

Online eeergo

First camera almost installed, driving the last bolts.
« Last Edit: 06/05/2008 04:06 pm by eeergo »
-DaviD-

Offline Fuji

  • Full Member
  • ****
  • Posts: 1231
  • Japan
  • Liked: 234
  • Likes Given: 15
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
« Reply #62 on: 06/05/2008 04:07 pm »
Anybody know the specs of the Kibo cameras?   I'm hoping they will be hi-def....
HDTV experiment: http://iss.jaxa.jp/kibo/kibomefc/hdtvcam_e.html


These are not HDTV camera. Development was a long time ago.

Online eeergo

The connector for the camera data and power supply has been mated.
« Last Edit: 06/05/2008 04:12 pm by eeergo »
-DaviD-

Online eeergo

Ron thinking about wrapping the trunnion keel now with the thermal cover, instead of waiting, given he's in a good position.
-DaviD-

Online eeergo

Good view of Fossum installing the second camera.

I've got to leave now, should study something before it's dinner time ;) Anyone willing to take over, please do!
-DaviD-

Offline Chris Bergin

Thanks very much for your assistance :) I'm back to full speed, after quick trip to the shops for a new router. Salesman helped with prompt service, noting "broadband issues? But it's EVA-2! Damn, let's get you sorted immediately!" *

*Some of that story may have been frabricated ;)

Glove checks note gloves are in a pristine condition.

Heard PAO mention the mods to the EMU gloves. Background here:
http://www.nasaspaceflight.com/content/?cid=5430
« Last Edit: 06/05/2008 04:30 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Flying over the Ariane launch pads at present.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline maxx

  • Full Member
  • *
  • Posts: 179
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
« Reply #68 on: 06/05/2008 04:32 pm »
activating heaters on the cameras from the ground

PAO:crew on time.

Offline Chris Bergin

EVA is right on the timeline.

Covers being removed from the RMS.
« Last Edit: 06/05/2008 04:32 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Oh my! 210 miles over the Atlantic.
« Last Edit: 06/05/2008 04:36 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

"It's like trying to wrestle a cloud in these conditions."
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

1hr 34mins into EVA-2.

Second of six thermal covers removed.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

And Ron's helmet cam during thermal cover removal.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Thermal Blanket about to come off the RMS EE.

ISS/Discovery passing over France and Belgium.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline chksix

  • Veteran
  • Full Member
  • ****
  • Posts: 424
  • Sweden
  • Liked: 0
  • Likes Given: 0
Re: LIVE: STS-124 Flight Day 6 - EVA 2 / JEM-PM outfitting
« Reply #75 on: 06/05/2008 04:45 pm »
I miss the "old days" when PAO usually went quiet when there was comms on the channel in the middle of his briefing. Now a lot of the EVA comms get drowned out by info that isn't critical at the moment.
Hoping for a future of NASA manned spaceflight

Offline Chris Bergin

Mike asking about a long peice of wire, thinks it's associated with the cover. MCC-H don't sound too bothered.

Cover's off the EE.
« Last Edit: 06/05/2008 04:48 pm by Chris Bergin »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

40 minutes is the timeline for all the covers to come off.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

And another cover is removed. 1hr 46 minutes into EVA-2's planned 6hrs 30 minute spacewalk.
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Offline Chris Bergin

Locations:
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1